Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 2 - 2nd Floor Punch List - Friday - 05/25/07 <br /> June 5, 2007 <br /> Page 3 <br /> Reception Room 201 continued) <br /> 8 . Fire extinguisher cabinet needs to be caulked where it abuts the drywall. <br /> 9 . Wall is full of drywall dust and fingerprints. Needs to be cleaned and repainted if necessary . <br /> 10. Boxed out column between Doors 307A & 201B need to be repaired at the base. Vinyl base not adhering at <br /> the outside corners and also drywall mud and dust at this location needs to be patched and repaired. <br /> 11 . Bottom left of Door 201B drywall is irregular just above the vinyl base needs to be sanded and repainted. <br /> 12. Drywall between the two electrical outlets at the center of the wall needs to be repainted . Also, touchup <br /> marks fingerprints, etc. , on this wall in numerous areas need to repainted if necessary . <br /> 13 . West end of drywall exterior wall on the wall adjacent to Work Room 303, electrical outlets cut-in have been <br /> patched, needs to be sanded and repainted. <br /> 14. West exterior wall windows need to be cleaned of drywall dust. No blinds have been hung at this time . <br /> 15 . Conan sills need to be cleaned of dirt and debris and paint. <br /> 16. Northernmost six glass window, below that window is scuff marks on the drywall , needs to be patched and <br /> repaired. That is also true to the left between the Data outlets and this same window area of the wall needs to <br /> be repainted. <br /> 17 . Glass window bottom left data outlet has been installed and patched & repaired, this needs to be sanded and <br /> repainted. <br /> 18 . To the left of data outlet 27D & 28D approximately 2ft. there is a chip in the drywall needs to be patched and <br /> repaired. <br /> 19. Left exterior wall needs to be completely repainted the complete length, patch work at the electrical outlets. <br /> 20. Drywall is not painted below the window sills . <br /> 21 . Drywall dust on vinyl base needs to be cleaned. <br /> 22. South near Northeast corner at Office 204A and exterior window up at the ceiling level tape at the joint for <br /> the drywall is showing this needs to be patched, sanded and repainted. <br /> 23 . At this time ceiling grid installed, ceiling tile is only installed at the perimeter approximately 10% installed. <br /> 24. To hard to inspect the ceiling grid as far chips and damage until the ceiling tile has been installed. <br /> Office 203 <br /> 1 . Door 203A - Metal frame for view light window on exterior side, paint is chipped needs to be patched and <br /> repaired. <br /> 2 . Door needs to be cleaned of drywall dust, mud, etc . <br /> 3 . No silencers in the door frame. <br /> 4. Door frame needs to be touched-up with paint inside and out, chips , etc. on the door frame. <br /> 5. No door stop installed for this Door 203 . <br /> 6. Hollow metal frame top left where it abuts the drywall above the light switch needs to be repainted around the <br /> perimeter. Also, top right corner has wall paint on it needs to be cleaned and repainted . <br /> 7. West wall below the quad outlet drywall is irregular, needs to be sanded and repainted . Also, electrical outlet <br /> covers needs to be cleaned of paint, dirt and debris . <br /> 8 . Island wall between Office 203 & 204 where it abuts up against the fixed glass window outside face of the <br /> wall needs to be sanded and repainted. Also, top right edge of this window opening needs to be sanded and <br /> repainted. <br /> 9 . No window blinds installed. All windows need to be cleaned of dirt and debris . <br /> 10. Westernmost window and Office 203 drywall needs to be caulked where it abuts the window sills. <br /> 11 . East wall drywall by the duplex electrical outlet needs to be sanded and repainted in numerous areas. Also, <br /> this same location about the middle of the wall to the top left of the electrical outlet chip in the drywall needs <br /> to be patched and repaired. <br /> 12. Drywall dented where the door lockset has been hitting the drywall due no wall stop installed. <br /> 13 . Ceiling tile installed in approximately 50% of the room. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />