§ 2.3.2.7 The Construction Manager shall develop a system of cost control for the Work, including regular <br /> monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes . The <br /> Construction Manager shall identify variances between actual and estimated costs and report the variances to the <br /> Owner and Architect at regular intervals. <br /> 2.3.2.8 The Construction Manager shall develop and maintain a program; acceptable to the Owner and tf e Architect to <br /> assure quality control of the construction. The Construction Manager shall su ervise the Work of all Sub c ntractors <br /> providing instructions ,to each when its Work does not conform to the requirements of the plans ands eci (cations and <br /> continue to manage each Subcontractor to ensure that corrections are made in a timely manner so as not t affect the progress <br /> of the Work. Should disajzreemcnt occur between the Construction Manager and the Architect over acceptability of Work and <br /> conformance with the re uirements of the plans andspecifications, the Owner shall be the final Judge of performance and <br /> acceptability. § 2.3.2.91 The Construction Manager shall maintain exclusively for the Project a competent ull-time staff at the <br /> Project Site to coordinate. and direct the Work and progress of the Subcontractors. All of the Construction Manager' s on-site <br /> management and supervisory, ersonnel shall be consistent with the Construction Manager' s interview r sentation and shall <br /> not be removed or replaced without the Owner' s consent which consent wil l not be unreasonably withhe d. The Owner shall <br /> It ave the right to direct the Construction Manager to remove or replace any on-site personnel whose performance becomes <br /> unsatisfactory to the Owner. In' such event the Construction Manager shall promptly replace such Mrso iel. without <br /> consideration of any additional compensation for the replacement. <br /> 2.3.2'.10 The Construction Manager shall establish on-site organization and lines of authority in order to cau out the <br /> overalllaps of construction. The Construction Manager shall identify an on-site staff member to reDreset t the Construction <br /> Manager, on a daily basis with authority to negotiate change orders and contract modifications on behalf f the Construction <br /> Manager. The'Construction Manager shall make available such executive personnel as necessary to exec u a change orders or <br /> other contract modifications on behalf of the Construction Manager so as not to delay the progress of Woj k. <br /> 2.3.2.11 The Construction Mana er shall establish procedures for coordination among the Owner. Architect, <br /> Subcontractors and Construction Manager with res ct to all aspects of the Work. The Construction Manager shall require <br /> of the various Subcontractors coordination drawings as may be necessTy to proWrly coordinate the Wort -, among the <br /> Subcontractors. <br /> 2.3.2.12 In coordination with the Architect the Construction Manager shall establish and implement procedures <br /> for tracking and expediting the processing of shop drawings and samples, as required by the A201TM- 199 as <br /> modified . <br /> 2.3.2.13 The Construction Manager shall determine the adeguacy of Subcontractors ' pqrsonnel and aqui Iment, and <br /> the availability of materials and supRligrito meet the Project Schedule. In consultation with the Owner an Architect <br /> the Construction Manager shall take necessary corrective actions when re uirements of a Subcontract or <br /> Subcontractor' s schedule are not being met. <br /> § 2.4 PROFESSIONAL SERVICES <br /> Section 3 . 12. 10 ofA201TM- 1997, as modified. shall apply to both the Preconstruction and <br /> Construction Phases. <br /> §2.5 HAZARDOUS MATERIALS <br /> I- Section 10.3 of A2011M-1_997 A201Tm- 1997, as modified, shall apply to both the Preconstruction and Construction <br /> Phases. <br /> ARTICLE 3 OWNER'S RESPONSIBILITIES <br /> § 3.1 INFORMATION AND SERVICES <br /> § 3.1 . 1 The .Owner shall provide full information in a timely manner regarding the requirements of the Proect, <br /> including a program which sets forth the Owner' s objectives, constraints and criteria, including space req irements <br /> and relationships, flexibility and expandability requirements, special equipment and systems, and site <br /> requirernerit re uirements if re nested in writin b the Construction Mana er s cif in the reason for he needed <br /> information. <br /> AIA Document A121 TuCMe — 2003 and AGC Document 565. Copyright ® 1991 and 2003 by The American Institute of Architects and The Associated <br /> General Contractors of America. All rights reserved. WARNING: This document Is protected by U.S. Copyright Law and International Treaties. 7 <br /> Unauthorized reproduction or distribution of this document, or any portion of It, may result in severe civil and criminal penalties, and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:50:12 on 04/19/2005 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. (1413727908) <br /> User Notes: J <br /> �y <br />