NOME <br /> § 2.2.10 The Guaranteed Maximum Price shall include in the Cost of the Work only those taxes which are m.nacted at <br /> the time the Guaranteed Maximum Price is established. <br /> § 2.3 CONSTRUCTION PHASE <br /> § 2.3. 1 GENERAL <br /> § 2.3. 1 .1 The Construction Phase shall commence on the Owner' s written acceptance of the earlier- of- <br /> R ) he Owner-' s aee.eptanee of the Genstmetien Manager-' s Guaranteed Maximum Pd �w F and. <br /> (-2) the Owner' s fifst authorization to the Genstfuetion Manager- to -i <br /> (b) undeftake construction Wof-k with the Construetion , <br /> Work-.Constructioik <br /> Manager' s Guaranteed Maximum Price proposal and the issuance of a Notice to Proceed. <br /> § 2.3.2 ADMINISTRATION <br /> § 2.3.2.1 Those, portions of the Work that the Construction Manager does not customarily perform with the <br /> Construction Manager' s own personnel shall be performed under subcontracts or by other appropriate agr ements <br /> with the Construction Manager. The Construction Manager shall obtain bids from Subcontractors and froi ri suppliers <br /> of materials or equipment fabricated to a special design for the Work from the list previously reviewed an , after <br /> analyzing such bids, shall deliver such bids to the Owner and Architect, The Owner will then determine, v Fith the <br /> advice of the Construction Manager and subject to the reasonable objection of the Architect, which bids ill be <br /> accepted. The Owner may designate specific persons or entities from whom the Construction Manager sh 11 obtain <br /> bids; however, if the Guaranteed Maximum Price has been established, the Owner may not prohibit the Construction <br /> Manager from obtaining bids from other qualified bidders. The Construction Manager shall not be required to <br /> contract with anyone to whom the Construction Manager has reasonable objection. <br /> § 2.3.21 If the Guaranteed Maximum Price has been established and a specific bidder among those whose bids are <br /> delivered by the Construction Manager to the Owner and Architect ( 1 ) is recommended to the Owner by I ie <br /> Construction Manager; (2) is qualified to perform that portion of the Work; and (3) has submitted a bid w iich <br /> conforms to the requirements of the Contract Documents without reservations or exceptions, but the Own ar requires <br /> that another bid be accepted, then the Construction Manager may require that a change in the Work be iss ied to <br /> adjust the Contract Time and the Guaranteed Maximum Price by the difference between the bid of the per on or <br /> entity: recommended to the Owner by the Construction Manager and the amount of the subcontract or oth r <br /> agreement actually signed with the person or entity designated by the Owner. <br /> § 2.3.2.3 Subcontracts and agreements with suppliers furnishing materials or equipment fabricated to a spem.ial design <br /> shall conform to the payment provisions of Sections 7 . 1 .8 and 7. 1 .9 and shall not be awarded on the basis of cost <br /> plus a fee without the prior written consent of the Owner. <br /> § 2.3.2.4 The Construction Manager shall schedule and conduct meetings at which the Owner, Architect, <br /> Construction Manager and appropriate Subcontractors can discuss the status of the Work. The Construction <br /> Manager shall prepare and promptly distribute meeting ff9*wte�minutes to attendees. <br /> § 2.3.2.5 Promptly after the Owner' s acceptance of the Guaranteed Maximum Price proposal, the Construction <br /> Manager shall prepare a' schedule in accordance with Section 3 . 10 of A201TM- 1997, as modified, including the <br /> Owner' s occupancy requirements. <br /> § 2.3.2.6 The Construction Manager shall provide monthly written reports to the Owner and Architect on t ie <br /> progress of the entire Work. The Construction Manager shall maintain a daily log containing a record of N reather, <br /> Subcontractors working on the site, number of workers, Work accomplished, problems encountered and o Lher <br /> similar relevant data as the Owner may reasonably require. The log shall be available to the Owner and A chitect <br /> that shall be at least monthly and in writing The Construction Manager acknowledges and Amhiteet—. ai ees that <br /> Section 8 .2 .3 of the A201TM- 1997 as modified is applicable in such circumstances. <br /> AIA Document A121 TmCMc — 2003 and AGC Document 565. Copyright © 1991 and 2003 by The American Institute of Architects and The Associated <br /> General Contractors of America. All rights reserved. WARNING : This document is protected by U.S. Copyright Law and International Treaties. 6 <br /> Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal penalties, and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:50:12 on 04/ 19/200 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. (1413727908) <br /> User Notes: 6 <br />