Laserfiche WebLink
Condition Detail <br /> IRC ADMIN Drywall Changes <br /> Bid No. 14 <br /> Condition No.: 14 Section Mat. Lab, Unit Total <br /> Name: Rev 11 : Added Door Frames 9250 3.49 156.06 159.55 636 <br /> Type: Interior Walls <br /> Area: Building 1 <br /> Quantity 1: 4EA <br /> Quantity 2: 0 <br /> Quantity 3: 0 <br /> Height: 13' 0" <br /> Count: 0 <br /> Notes: <br /> No. Section Item Lab. Code Height OC Layers Qty UOM Size Mat. Price Per Lab. Cost MatTotal LabTotal <br /> 1 9250 HMF DOOR FRAME 4 EA 0.00 1 EA 75.000 0 300 <br /> 2 9250 S35820 STUDS20 26 LF 13' 455.00 1 ,000 LF 0.350 12 9 <br /> Combined Markup Totals Material Labor Total <br /> Net Totals - - - - - - - _ - - - --1183- - - - _ _ ___ - 309.10._ _- --- --320.93 <br /> Stock11 .16 <br /> 0.00 11 .16 <br /> Clean 0.00 22.32 22.32 <br /> Supervision _ 34.76 34.76 <br /> Per Diem _ 000 0.00 <br /> Escalation 0.00% 0.00 0.00% 0.00 0.00 <br /> Tax/Burden 7.00% 0.83 - 50.05% 186.86 189.69 <br /> SubTotals 12.66 666.20 578.86 <br /> Overhead 5.00% 0.63 5.00% 28.31 28.94 <br /> Profit 5.00% 0.66 5.00% 29.73 30.39 <br /> Section Totals 13.96 624.24 638.19 <br /> 10/06/2006 4:48:45 pm Page 1 <br />