My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-137D
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-137D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 11:32:43 AM
Creation date
9/30/2015 10:45:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/17/2007
Control Number
2007-137D
Agenda Item Number
11.C.1
Entity Name
Turner Construction
Subject
Change Order No. COR-096
Area
County Administration Building 1801 27th St.
Project Number
11531
Supplemental fields
SmeadsoftID
6269
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tumor <br /> Building the Future <br /> IRC New Admin Building Transmittal <br /> Project # 11531 [Cover Sheet, Detailed, Grouped by Each Transmittal Number] <br /> 2625 19th Avenue <br /> Vero Beach , FL 32960 Telephone: 772.564 .8141 Fax: 772.564.8143 September 18, 2006 <br /> Date: rr . r <br /> Hf ... *f_��.t"`�„ [�F�f4t i3 r�+ 1. .�.s..°,`a.�na '' "�nv�� '��-:�£�`�,� .a • . ", .�.. <br /> Doug Capps Karen Berg <br /> Acousti Engineering Company of Florida Turner Construction Company <br /> 426 Gus Hipp Blvd. 2625 19th Avenue <br /> Rockledge, FL 32955 Vero Beach, FL 32960 <br /> Tel: 321 -636-4042 Tel : 772-564-8141 <br /> Fax: 321 -636-4087 Fax: 772-564-8143 <br /> Q Acknowledgement Required <br /> Review, Pricing as appropriate Federal Express <br /> 001 1 Drawings and Sheet: 1 -A1 .1 . 1 Building 1 -First Floor Partial For Construction <br /> Specifications Revision 11 Floor Plan <br /> Dated: 8/15/2006 <br /> 002 1 Drawings and Sheet: 1 -A8.0. 1 Building 1 -Door Schedules For Construction <br /> Specifications Revision 11 <br /> Dated: 8/15/2006 <br /> 003 1 Drawings and Sheet: 0-E1 .0 Electrical Site Plan For Construction <br /> Specifications Revision 12 <br /> Dated: 8/25/2006 <br /> 004 1 Drawings and Sheet: O-E4. 1 .0 Electrical Riser Diagram For Construction <br /> Specifications Revision 12 <br /> Dated: 8/25/2006 <br /> 005 1 Drawings and Sheet: O-E5. 1 .1 Schedules For Construction <br /> Specifications Revision 12 <br /> Dated: 825/2006 <br /> 006 1 Drawings and Sheet: O-E5.1 .2 Schedules For Construction <br /> Specifications Revision 12 <br /> Dated: 825/2006 <br /> 007 1 Drawings and Sheet: 0-E5.1 .3 Schedules For Construction <br /> Specifications Revision 12 <br /> Dated: 8/25/2006 <br /> 008 1 Drawings and Sheet: 0-E5.1 .4 Schedules For Construction <br /> Specifications Revision 12 <br /> Dated: 8/252006 <br /> 009 1 Drawings and Sheet: 0-E5.1 .5 Schedules For Construction <br /> Specifications Revision 12 <br /> Dated: 8/25/2006 <br /> 010 1 Drawings and Sheet: 0-E5.1 .6 Schedules - Emergency For Construction <br /> Specifications Revision 12 <br /> Dated : 8/252006 <br /> D11 1 Drawings and Sheet: 0-E5. 1 .7 Schedules - Emergency For Construction <br /> Specifications Revision 12 <br /> Dated: 8/25/2006 <br /> 012 1 Drawings and Sheet: 0-E5. 1 .8 Schedules - Emergency For Construction <br /> TCCO - Transmittal Cover Sheetrpt <br /> RPT Revised: 3/10/2006 Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.