My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:27:56 AM
Creation date
9/30/2015 11:02:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/20/2007
Control Number
2007-263A
Agenda Item Number
county administer signature
Entity Name
Turner Construction Donadio & Associates
Subject
Punch List Building 1 - 1st Floor - East Half
Supplemental fields
SmeadsoftID
6489
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 — 1st Floor Punchlist — Friday 04/20/07 <br /> May 07, 2007 <br /> Page 3 <br /> Production 2041 Work Room 205 (continued) <br /> 10. North wall, left inside corner where the filler strip abuts the drywall, drywall needs to be sanded and repainted <br /> and also filler strip needs to be re-caulked. <br /> 11 . Ceiling grid perimeter ceiling tile where the main runner over laps the ceiling grid, ceiling tile is not sitting <br /> flush in the grid, this needs to be resolved. <br /> Cash Counting Office 206 <br /> 1 . Door 206 does not close into the frame. Hitting on the top inside. Needs to be adjusted to close properly. <br /> 2. Hollow metal door frame on the bottom right and left needs to be repainted where brown paint overspray and <br /> chips on the hollow metal frame . <br /> 3 . Carpet in place, vinyl base in place and ceiling in place. <br /> 4. Furniture in boxes installed in this room. At this time leaning up against the wall, etc. <br /> 5 . Receptacle to the left of Door 206, drywall needs to he sanded and repainted where openings cut too large. <br /> 6. Drywall where it abuts the left side, strike side of Door 206 needs to be sanded, caulked and repainted. <br /> 7 . To the left of Door 206 the South wall towards the left inside corner, paint overspray needs to be sanded and <br /> repainted. <br /> 8 . East wall, carper adhesive on the wall needs to be cleaned. <br /> 9 . North wall about the middle of the wall, approximately to 12 to 16 inches off the floor, there is a bulge in the <br /> drywall that needs to be repaired and repainted. <br /> 10. Bottom right of door 206 on Office 206 side, drywall is irregular and where it abuts the hollow metal frame <br /> needs to be sanded and re-caulked. <br /> Office Area 207 <br /> 1 . Inside face of Door 207 , bottom below the light panel does not appear to have proper finish. <br /> 2 . Outside face Of door 207 same thing, the grain is showing through the finish. Appears not be finished <br /> properly unless that' s paint, but there are scratches and the floor needs a lot of work. <br /> 3. Hollow metal door frame needs to be cleaned of carpet adhesive and chips on the outside edges. <br /> 4. Window adjacent to Door 207A the bottom right and left corners, all corners are very irregular, Unacceptable, <br /> need to be sanded and repainted. That is also true of the window frame to the far right or to the North , Very <br /> irregular and rough, needs to be sanded and repainted . <br /> 5 . Carpet installed and vinyl base installed at this time. <br /> 6. Drywall to the left of Door 207A, carpet glue on it needs to be cleaned and also drywall needs to be sanded <br /> where it abuts the metal door frame, very irregular. <br /> 7 . Furniture boxes placed in the room. <br /> 8. Drywall at South wall, drywall to the right of the hollow metal frame above the light switch is very irregular, <br /> needs to be sanded and repainted. That is also true of the drywall above the top right corner of the hollow <br /> metal window to Door 207B . <br /> 9. Drywall below the hollow metal frame of the windows for 207A & B need to be sanded and repainted. <br /> 10. To the right of door frame 207B , drywall below hollow metal window where it abuts the hollow metal door <br /> frames needs to be sanded and repainted. <br /> 11 . Hollow metal door frame to the right at the strike side of Door 207B needs to be repaired at the top and the <br /> right where there is brown paint on the door. <br /> 12. View lite 207, bottom right and underneath the hollow metal frames just above the quad outlet, drywall is <br /> very irregular, needs to be sanded and repainted. <br /> 13 . Hollow metal frame bottom left just to the right of the bottom left metal frame is dented and damaged. <br /> Painting on frame is very irregular needs to be sanded and repainted in numerous locations all around the <br /> opening. <br /> 14. To the left of the view lite 207, drywall where it abuts the hollow metal frame needs to be sanded and <br /> repainted. That is also true of the drywall on the right side and also needs to be re-caulked. <br /> 15 . Left inside corner to the left of view lite 207 , irregular in the drywall just above the vinyl base, needs to be <br /> sanded and repainted. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.