Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 — 1st Floor Punchlist — Friday 04/20/07 <br /> May 07, 2007 <br /> Page 4 <br /> Office Area 207 (continued) <br /> 16. North wall is inaccessible, furniture boxes is stacked up along the wall, unable to see the complete wall . <br /> 17 . Ceiling tile in front of Door 207B to the East of the A/C Grille and just to the North of the Can Light tile is <br /> chipped and needs to be replaced. <br /> Open Area 208 <br /> 1 . Carpet installed at this time. <br /> 2. No vinyl base installed. <br /> 3 . Ceiling tiles installed except for 5 or 6 tiles have been removed. <br /> 4. Access way leading into 208 adjacent to Office 207 , drywall to the bottom right of Door 207 needs to be <br /> sanded and repainted. <br /> 5 . Bottom left of door frame 207 on the hallway side needs to be sanded and repainted, rough and irregular. <br /> 6. Ceiling grid along the South wall of Open Area 208 on the West, the right outside corner of Office 207, <br /> ceiling grid is not set level. Also, in this same area tape, paint on the wall, grid needs to be removed. <br /> 7 . South wall about the center of the wall over the Data outlets, streaks on the paint and also chips on the <br /> drywall need to be cleaned, patched and repaired. <br /> 8 . Right outside corner leading to Corridor 210 is chipped, needs to be patched and repaired. Also, header at <br /> this location between Open Office and Corridor 210 between Office Area 209 and Door 202, right and left <br /> side joints where the header abuts the outside corner of the walls needs to be redone, tape is exposed. <br /> 9. Ease wall the wall adjacent to Office 209, center wall is marked with dirt and fingerprints , needs to be cleaned <br /> the whole length of the wall . Also, carpet adhesive needs to be removed. <br /> 10. Bottom right East inside corner at the exterior wall needs to be touched up with paint. <br /> 11 . Exterior windows right and left jambs drywall needs to be touched up with paint in numerous areas. Caulking <br /> needs to be re-caulked where it is cracked . <br /> 12. Second window to the West (left) from Office Area 209 the first double window, drywall below the quad <br /> outlet needs to be sanded and repainted. Rough finish. <br /> 13 . Westernmost window on the North wall (the far left), left jamb where the drywall and the window sill meet <br /> needs to be caulked. Right now is open and exposed. Also, in this same area, left inside corner below <br /> window sill needs to be touched up with paint. <br /> 14. Fire extinguisher cabinet on the West wall needs to be caulked where it abuts the drywall . Also, fire alarm <br /> horn strobe in this same area needs to be cleaned of paint. <br /> 15 . Drywall just below the fire extinguisher cabinet on the West wall nick in the drywall has been painted over, <br /> needs to be patched and repaired. That is also true of a couple areas to the left of this same location <br /> approximately 6 or 7 ft. <br /> Office 209 <br /> 1 . Door 209 hinge bound will not close. <br /> 2. Door frame 209 needs to be sanded and repainted on both sides, approximately couple of feet up from <br /> the bottom. Also, top right outside face, outside corner needs to be sanded and repainted on the hollow <br /> metal frame. <br /> 3 . Inside face bottom left at the bottom hinge hollow metal paint is very irregular needs to be sanded and <br /> repainted . <br /> 4. Carpet installed, vinyl base installed and ceiling tile installed. <br /> 5. Furniture in boxes installed in this room at this time. <br /> 6. Vinyl base inside comers are wrapped not cut, pulling away from the comer, needs to be re-worked . <br /> 7. Window blinds installed. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />