My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-289
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 2:10:40 PM
Creation date
9/30/2015 9:03:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
08/23/2005
Control Number
2005-289
Agenda Item Number
11.C.2
Entity Name
Turner Construction
Subject
Amendment No. 2 - Guaranteed Maximum Price
Area
New County Administration Complex
Supplemental fields
SmeadsoftID
5140
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C*U0R1ft1'C04 <br /> Indian River County Turner <br /> Administration Complex <br /> Final GMP Summary <br /> Qualifications & Assumptions <br /> Report Date: August 16, 2005 <br /> 3 The scope of work includes installation of water meters . Water meters are to be furnished <br /> by the Owner . <br /> 4 The GMP is based upon the 15 " , 18 " , 24" and 30 " storm drainage piping being HDPE <br /> piping in lieu of CAP piping for these diameters only . <br /> 5 An allowance of $26 , 240 is included in the GMP for the water line extension that may be <br /> required to replace the 6" PVC water line indicated as existing on sheet 32 of 33 of the <br /> Civil Drawings . <br /> Bid Package 2a Demolition <br /> Specifications : <br /> 1 Demolition specification sections were not provided . Notes on the drawings are <br /> acknowledged as specifications . <br /> Drawings : <br /> 1 The fuel tank indicated on the drawings as existing , is understood to have been previously <br /> removed by the Owner and any cost associated with this tank is not included in the GMP . <br /> 2 The removal and remediation of any contaminated soil is excluded from the GMP . <br /> 3 Hazardous material survey and asbestos abatement is excluded from the GMP . <br /> 4 No cost is included for the removal of the power lines . It is assumed that this work will be <br /> performed by the Utility Company . <br /> 5 The cost for the removal or relocation of the underground fiber optic cables is not included <br /> in the GMP . <br /> 6 The GMP is based on the assumption that the retainage for the demolition subcontractor <br /> will be released after all their work is completed . <br /> Bid Package 2b Tree Relocation <br /> Specifications . <br /> 1 Tree Relocation specification sections were not provided . Notes on the drawings are <br /> acknowledged as specifications . <br /> Drawings : <br /> 1 The GMP includes relocation of twenty trees as indicated on the tree relocation plan dated <br /> 5/27/05 . The Owner will coordinate with Turner for the specific location of the tress to be <br /> relocated . <br /> 2 There is no warranty for the relocated trees . Trees are not guaranteed against tropical <br /> storm winds above 40 miles per hour , salt , cold temperatures , lethal yellowing , etc . <br /> 3 Any maintenance for the relocated trees is assumed to be by the Owner . The GMP <br /> includes the initial fertilization and tree staking . <br /> 4 The GMP is based on the assumption that the retainage for the tree relocation <br /> subcontractor will be released after all their work is completed . <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.