Act ' Activity` Orig Months
<br /> ID Description Dur 1 1 3 4 5 6 7 8 9 1 10 1 11 1 12 1 13 14 1 15 1 16 1 17 1
<br /> 18
<br /> CONSTRUCTION
<br /> Overall Construction Summary
<br /> MIAA164 ITumer Receive Notice to Proceed (NTP) 0 4 IoTurner Receive Notice to Proceed (NTP)
<br /> MIAA168 Pre-Construction 14 S re-Construction
<br /> MIAA169 Overall Project Duration - NTP to Sub Compl 468 Overall Project Dur
<br /> MIAA190 Substantial Completion 0 Substantial Completio*
<br /> MIAA200 Close Out 42 Close Ou®
<br /> MIAA210 Final Completion L 0 Final Completions
<br /> SUC0000 Bldg 1 Clean & Punch 30 Bldg 1 Clean & Punch
<br /> SUC0180 Final Inspections, Testing , Obtain CofO 40 Final Inspections, Testing, Obtain Com
<br /> Sitework Summary --__--_ _T-- -- --
<br /> SUSW000 Paving/ Site Amenities/ Landscaping 75* Paving/ Site Amenities/ Landscaping
<br /> SUSWO04 Early Site - Mob thru Site Utilities 100* Early Site - Mob thru Site Utilities
<br /> Building 1 Construction Summary
<br /> B1500 Building 1 Overall Summary 265* 1 Building 1 Overall S
<br /> B1504 UG MEP, Foundations thru Roof Dry-in 120* UG MEP, Foundations thru Roof Dry-in
<br /> 81508 MEP/FS Rough-in , Mtl Studs thru Wall 55* MEP/FS Rough-in, Mtl Studs thru Wall Inspections
<br /> 81512 Barrel Tile Roof System thru Stucco & Ext Paint 75* Barrel Tile Roof System thru Stucco & Ext
<br /> Paint
<br /> B1516 Drywall thru Prime Paint 55* Drywall thru Prime Paint
<br /> B1520 Ceiling Grid , MEP/FS in Grid , Acou Ceiling Tile 55* Ceiling Grid, MEP/FS in Grid, Acou Ceiling T .�
<br /> 61524 AC , Finish Paint, Tile, Millwk, Carpet, & Clean 55* AC, Finish Paint, Tile, Millwk, Carpet, & Cie UIQ
<br /> B1528 Clean & Prep, Owner/AE Punch ListNVork 20 Clean & Prep, Owner/AE Punch List/Wo® CD
<br /> Building 2 Construction Summary IJ
<br /> tQ
<br /> B2500 Building 2 Overall Summary 218* Building 2 Overall Summary
<br /> B2504 UG MEP, Foundations thru Roof Dry-in 91 * UG MEP, Foundations thru Roof Dry-in
<br /> B2508 MEP/FS Rough-in , Mtl Studs thru Wall 50* MEP/FS Rough-in , Mtl Studs thru Wall Inspections
<br /> 82512 Barrel Tile Roof System thru Stucco & Ext Paint 60* Barrel Tile Roof System thru Stucco & Ext Paint
<br /> 82516 Drywall thru Prime Paint 40* ®Drywall thru Prime Paint
<br /> 82520 Ceiling Grid , MEP/FS in Grid, Acou Ceiling Tile 40* ®Ceiling Grid, MEP/FS in Grid, Acou Ceiling Tile
<br /> 82524 AC , Finish Paint, Tile, Millwk, Carpet, & Clean 46* AC, Finish Paint, Tile, Millwk, Carpet, & Clete
<br /> 82528 Clean & Prep, Owner/AE Punch List/Work 20 Clean & Prep, Owner/AE Punch List/WoiIIIIIIIIIIIIIIIIIIIIII
<br /> SWA00 Mobilize, Instl Site Fence& Erosion Control 15 IIIIIIIIIIIIIlMobilize, Instl Site Fence& Erosion Control
<br /> SWA04 Install Temp Water & Electrical 10 IIIIIIIIIIIInstall Temp Water & Electrical
<br /> SWA08 Demo Structures , Site Utilities, and Pvmt 15 Demo Structures, Site Utilities, and Pvmt
<br /> SWA12 Remove Trees, Clear & Grub Site, Site Grading 25 —Remove Trees, Clear & Grub Site, Site Grading
<br /> SWA16 Prep Building Pads / Stake & Layout Buildings 5 EPrep Building Pads / Stake & Layout Buildings
<br /> SWA20 Bldg 2 Building Pad Ready 0 *Bldg 2 Building Pad Ready
<br /> SWA24 Site Utilities - incl Storm 80 Site Utilities - incl Storm
<br /> SWA28 Construct Roadway Subgrade and Base 20 Construct Roadway Subgrade and Base
<br /> SWA32 Pavement & Sidewalks 30 ®Pavement & Sidewalks
<br /> Run Date 26MAY0507:38 IROA Turner Construction Company Sheet 1 of 4 R01 Project Schedule
<br /> c^-- Finish Date 08DEC06
<br /> Data Date 11APR05 Indian River County Administration Facility
<br /> © Primavera Systems , Inc. GMP Summary Schedule