Laserfiche WebLink
Act Activity Orig <br /> ID Description Dur _1 1 7 1 8 TQR91h51 10 1 11 1 12 1 13 1 14 1 15 1 16 17 1 <br /> SWA36 Site Lighting <br /> --- ^ — 15 ®Site Lighting <br /> SWA40 Irrigation & Landscaping 30 ®Irrigation & Landscaping <br /> SWA44 Demo Fiber Optic, CAN & OH Lines (by others) 15 IIIIIIIIIIIIIIIIDerno Fiber Optic, CAN & OH Lines ( by others) <br /> SWA48 Pavers & Site Amenities 30 ®Pavers & Site Amenities <br /> SWA52 Bldg 1 Building Pad Ready 0 ®Bldg 1 Building Pad Ready <br /> Foundations - Piles thru Lvl 1 Verticals <br /> B1000 Deep UG MEP Utilities (Below Footings) 10 IIIIIINDeep UG MEP Utilities (Below Footings) <br /> B1004 Excavate, Form_ , Rebar, Pour, Strip Footings 30 SExcavate, Form, Rebar, Pour, Strip Footings <br /> Structure, Exterior, Roof <br /> B1008 CMU Walls & Tie-Beams to 2nd Lvl 35 —CMU Walls & Tie-Beams to 2nd Lvl <br /> 81012 Rebar, Form , Pour, Strip Conc Columns to 2nd 15 i Rebar, Form, Pour, Strip Conc Columns to 2nd Lvincl any conc <br /> beams <br /> 81016 Backfill & Compact SOG area 20 IIIIIIIIIIIIIIIIIIIII13ackfill & Compact SOG area intermittent <br /> B1020 Scaffold , Set PSI Soffit Bms, Layout for Joists 15 IIIIIIIIIIIIIIIIScaffold, Set PSI Soffit Bms, Layout for Joistsincl <br /> set spacers <br /> B1024 Set PSI Joists, Deck, Rebar & Pour 2nd Fir Slab 20 i1,Set PSI Joists, Deck, Rebar & Pour 2nd Fir Slab <br /> 81028 Rebar, Form , Pour, Strip Conc Cols to Roof Lvl 15 _Rebar, Form, Pour, Strip Conc Cols to Roof Lvlincl any conc <br /> beams <br /> 81032 Set Precast Columns, Beams & Arches 15 IIIl11III11IIII11Set PreCast Columns, Beams & Arches <br /> B1036 CMU Walls & Tie Beams to Roof Lvl 20 ®CMU Walls & Tie Beams to Roof Lvl <br /> B1040 Metal Pan Stairs, Conc Fill , Railings 20 ®Metal Pan Stairs, Conc Fill, Railings <br /> B1044 Remove Forms & Shores, UG Utilities thru SOG 25 Remove Forms & Shores, UG Utilities thru SOG <br /> 81048 Erect Structural Steel , Bar Joists & Mtl Deck 25 ®Erect Structural Steel, Bar Joists & Mtl Deck <br /> 'C3 <br /> B1052 Upper Rf - Lt Gage Frm'g thru Asph Sheets 10 Ii•Upper Rf - Lt Gage Frm'g thru Asph Sheets <br /> B1056 Upper Rf - Facia, Block'g , Insul, Sheath 'g , Asph 20 f1IIIIIIIIIIIIIIIIIII11Upper Rf - Facia, Block'g, Insul , Sheath'g, <br /> Asph fp <br /> 61060 Upper Rf - Barrel Roof Tile & Gutters 25 IIIIIIIIIIIIIIIIIIIIIIIIIIIIILIpper Rf - Barrel Roof Tile & Gutters <br /> lV <br /> W <br /> 81064 Lower Rf - Mansard Trusses, Formdk, Sheathing 15 it•Lower Rf - Mansard Trusses, Formdk, Sheathin§ Asph Sheet <br /> 81068 Lower Rf - Flat Rf Insulation & Lt Weight Conc 15 It•Lower Rf - Flat Rf Insulation & Lt Weight Conc <br /> B1072 Lower Rf - Flat Rf Modified Bitumin Roofing 10 IIIIIIINLower Rf - Flat Rf Modified Bitumin Roofing <br /> B1076 Lower Rf - Mansard Barrel Tile & Gutters 15 OLower Rf - Mansard Barrel Tile & Gutters <br /> 81080 Lath & Stucco (incl molded crown & trim ) 50 ®Lath & Stucco (incl molded crown & trim) <br /> B1084 IStanding Seam Roof 15 It•Standing Seam Roof• incl peel & stick wtrproof membrane <br /> 81088 Window / Storefront & Ext. Doors 30 Window / Storefront & Ext. Doors <br /> 61092 Exterior Paint 25 ®Exterior Paint <br /> Interior / Finishes <br /> 81096 MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) 25 ®MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) <br /> B1100 Plumbing Rough-in (incl water piping & insul) 35 ®Plumbing Rough-in (incl water piping & insul)CW, HW, Dom <br />, <br /> VW <br /> 81104 HVAC Rough-in ( Ductwork, Insulation) 70 HVAC Rough-in (Ductwork, Insulation) incls Set AHUs <br /> B1108 Elect Pwr/Ltg/FA/Systems Rough-in 70 IIIIIIIIIIIIIIIIIIIIIElect Pwr/Ltg/FA/Systems Rough-in Walls/Ceilings <br /> 81112 Fire Sprinkler Rough-in & Pressure Test 50 ®Fire Sprinkler Rough-in & Pressure Test <br /> B1116 HMtI Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs 50 ®HMtl Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs <br /> 81120 Install Hydraulic Elevators, Finish , Inspections 55 Install Hydraulic Elevators, Finish , Inspections <br /> 81124 Drywall , Tape & Finish Walls, Soffits & Ceilings 50 ®Drywall, Tape & Finish Walls, Soffits & Ceiling <br /> 81128 Main Stair & Balconys - Stru, Railings, Finish 50 Main Stair & Balconys - Stru, Railings, Finite <br /> B1132 Controls - Wiring , Devices , Test & Check-out 35 ®Controls - Wiring, Devices, Test & Check-ot <br /> B1136 1st Coat & Prime Paint 40 ®1st Coat & Prime Paint <br /> Run Date 26MAY0507:38 IROA Turner Construction Company Sheet 2of4 It01 Project Schedule <br /> Finish Date 08DEC06 <br /> Data Date 11APR05 Indian River County Administration Facility <br /> GMP Summary Schedule <br /> RIZ © Primavera Systems , Inc. <br />