Laserfiche WebLink
C. <br />New County Administration Building February 6, 2006 <br />Vero Beach, Florida <br />SCOPE OF WORK <br />for <br />Bid Package 10c—Signage <br />14. Weekly T0QIbex Safety meetings are to be held and signed minutes are to be submitted to <br />Turner Project Management by 3:30 PM every Friday. Minutes are to be signed by all <br />subcontractor employees on project. <br />15. `tf�addltlonal work is to be performed that is outside of the current scope of work, the <br />subdotractor will formally notify Turner and receive a Potential Change Order number (PCO <br />#) prior tompperforming any of the work, Turner will, in turn, issue formal direction to price <br />and/or proceed with the change. Any change order re u�s that were not specifically <br />requested by Tums or do not reference a valid PCOTnumber will be rejected in their <br />entirety. <br />16 Markup <br />on <br />work <br />performed b <br />ubcontmctor: <br />Owner, <br />but <br />in no <br />case shalt the <br />a Dunt to 6 <br />exceed 10%. <br />17. It is the responsibility of this subcontr ctor t <br />any authorities inspecting the pproject relating h <br />78. All submittals to be submitted in complete <br />Paragraph numbers not�n quantity, format, a <br />be limited to the amount allowed by the <br />d exceed 10% and the amount for profit <br />qualified personnel available to accompany <br />work. <br />ackag s with specifications sections and <br />forms a directed by Turner. <br />19 Contract Sum incluyt6 all Sales Tax and Insurance. <br />20. This subcontractor shall protect existing facilities, structures, adjacen <br />This subc94ractor is solely responsible for job safety associated wi <br />construction procedures, and damage or injury due to its act or neglect, <br />r and the public <br />scope of work, <br />1. /Traffic signs as indicated on the civil drawings (stop, handicapped parking, etc.) —by <br />Subcontractor <br />f co -c � ( <br />County logos set in the floor tile in the main lobbies of Building 1 and Building 2 — by Ceramic <br />ile Subcontractor <br />D. ALTERNATES <br />1. Add all signage identified in the Bid Documents dated 06/08/05 as ADD$2,252.00 <br />modified by Addendum No. 1 dated 06/29/05 for the area of the <br />Emergency Operations Center on the second floor of Building 2. <br />ALLOWANCES <br />1D� <br />F. <br />G. SCHEDULE <br />This subcontractor acknowledges thahthQ said work will_proceedinn accordance with the Project <br />Schedule asdevelopedby the 'Project Team"^agd its -Subcontractors and as revised by the 'Project <br />Team". Also, this subcontractor agrees,.to•pgftlicipate in.tbe requirements or the schedule as outlined <br />in the contract documents. .The-wd"rk of this agreement wilt^reuire that.submittals, shop drawings, <br />coordination drawings,, be sequenced in accordance with the aforementioned schedule unless agreed <br />to otherwise by the project learn. <br />. END OF SCOPE OF WORK <br />"Attachment X <br />Project #1153100 Initial <br />File/CSI# 10441 actAgr Identifying Devices Sub Initials <br />� <br />Subcontract Agreement#1753100-040—Images Graphic Specialties, Inc, TCC <br />Page 4 of 4 <br />