My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-160
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 1:45:20 PM
Creation date
9/30/2015 9:42:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/16/2006
Control Number
2006-160
Agenda Item Number
7.Z.
Entity Name
Turner Construction Company
Subject
Change Order #009 - GMP Shell Allowance
Area
New County Administration Bulding
Supplemental fields
SmeadsoftID
5629
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PCO - v I <br />New County Administration Building January 16, 2D06 <br />Vero Beach, Florida <br />SCOPE OF WORK <br />for <br />Bid Package 1Df—Access Flooring <br />13. Special efforts will be required of each Subcontractor and his subcontractors to control <br />the daily clean-up and removal of construction debris. Each Subcontractor shall provide <br />daily clean-up of all debris resulting from the Work of this scope of work (including�runch <br />rash, boxes, crates, pallets, water, undesignated Subcontractor debris and sw,ee¢i g and <br />mopping as required) to a designated area and/or container provided by Turner. Clean - <br />p shall take place continuously throughout each day. All areas will be:Eeaned up not <br />01 daily but as needed throughout the day, as deemed necessary by Turner's <br />supe,11p tendents or designated representatives. Should the Subcontractor fail to clean-up <br />the praZus day, prior to. the start of any Work the next day, and'upon eight hour notice, <br />the CM m perform the Subcontractor's clean-up and deduc 8 i.costs from the Contract. <br />14. Provide all warrappties and closeout documents. Zndsigned <br />thdontract documents. Warranties <br />will commence on t\eeflngsare <br />stantial Comple <br />15, Weekly Toolbox-Saare fo be hel/ minutes are to be submitted <br />to Turner Project M 3:30 PM every Friday. Minutes are to be signed by all <br />subcontractor emplt. <br />16. If additional work isd hat is outside of the current scope of work, the <br />subcontractor will formally notify Tuft and receive a Potential Change Order number <br />(PCO #) prior to performing any of the qk. Turner will, in turn, issue.formal direction to <br />price and/or proceed with th�change. Any change order requests that were not <br />specifically requestedby Tu er or do not'ieference a valid PCO # number will be <br />rejected in their entirety. <br />17. Markup on work perto ed by subcontractors shall bejmited to the amount allowed by <br />the Owner, but in n ase shall the amount for overhead a ceed 10% and the amount for <br />profit exceed 100 <br />18. It is the responsibility of this subcontractor to have qualifle ersonnel available to <br />accompan any authorities inspecting the project relating to his wor . <br />19. All su�rttittals to be submitted in complete packages with specificatio sections and <br />par raph numbers noted in quantity, format, and forms as directed by Tum <br />20. ontract Sum includes all Sales Tax and insurance. <br />21 This subcontractor shall protect existing facilities, structures, adjacent property and the <br />public. This subcontractor is solely responsible for job safety associated with this scope <br />of work, construction procedures, and damage or injury du its act or neglect. <br />�. EXCLUSIONS <br />1, Perforated airflow panels. <br />D. ALTERNATES } <br />1. Add the access flooring for Work Room2.2-317, including ADD $17,048.00 <br />twn (21 cfaneiarrl cnnnr;+w own c...,,;,.,..,r,.... <br />None <br />"Attachment X <br />Project 41153100 <br />F11e/CSI #10270 Access Flooring Initials <br />Sub: } ti <br />Subcontract Agreement #1153100 Floors, Inc. TCCb4 <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.