A .r. i l: 290b 12: 43 P^ Ron 4: �:a' 1 PfacOnn�L tt.rzlarnr, zsac. N' , 4548 P.
<br />.ova nn,vulST- FARMS ROAD
<br />.�-ST PALM BFACH, FLORIDA 33411(
<br />• P.(561) 793-5524 FAX:(561) 79L a21 kAGS idO. 1
<br />FT.PIPRCE (772) 461 97e3 FAX: (772) 54(51-3'{319
<br />PROP# 5771
<br />P R D P Q S A L DATE: 10/04/05
<br />PROPOSAL SUNUTTSD T0:
<br />TURNER CONSTRUCTION- INDIAN RI'JER C0.ADMI}72STRATSON COMPLE3I
<br />AD
<br />JOH
<br />800 NORTH MAGNOLIA AVE. 2755 18TH AVE.
<br />SUITE 500DO FL. 32803 VERO BCH.,FLA. 32960
<br />ORLANDO
<br />A DIIRGA XAL�`S---„"'—` B p 7718 05771C 05771p 0 7 1F5r'/�5771G—
<br />PHQNH' (407) 210-2500. PAX: (407) 210-2520 0577114
<br />WE HERESY SCTPM=T ESTIMATES FOR: LABOR AND MATERIAL FOR MASONRY WORK
<br />AS PER PLANS AND TRE FOLLOWING SCOPE,
<br />REVISED PROF09AL
<br />*** CONTRACT PROPOSAL*** to a-- C6y - 8i yl
<br />Scope: Block Work and Conczete Cell -Fill, Rebar Material and
<br />Placement in Masonry Only,
<br />Creciitt for Anttnna Enclosure: ($ 6,G75.00) d
<br />Credit for Fuel Tank & Condenser: ($ 12,900.00) 1� 2� ©�
<br />Credit for Dish Far: *Walls: ($ 5,100.00) --- �4
<br />e , ..,e __ Z,ine(J
<br />1. Standard ASTM -c90 Block, Grade N, Type II, Zearock.
<br />-
<br />\. Black figured to be high strength, no addit
<br />ti,All block and mortar to be standard grey co
<br />1'=OCk tO be broom finished.
<br />2. Cell 'll based on 3000 psi pump mix with 3
<br />3. Rebar mat riial and placement in masonry on1.
<br />4. �ITEMS iNCL=ODEA; scaffold, machinery, s cking, hoisting,
<br />�i+iilt rein o`_— crag, gash block & coat .. _joint,
<br />pumping Of cell -fill, tailored foamorm & pour beam for
<br />40block wainscot, compressible fillers & fire caulk,
<br />construction dumpster,,
<br />5: ITEMS NOT INCLUDED: 1� eel, welding, rigid insulations,
<br />cau ,'ng, sca an g, 'backe 'sods, dampprcofing, waterproofing,
<br />parging, flashing, temgdrary'b�racing, scuppers, er.�beds,
<br />ali decorative Areca t' stone, recieve off load & inventory
<br />and store protect o lay out of embeds.
<br />6. Install hallow'm tai frames in mason,=y: work only, material,
<br />ordering and storage by others,. It frames are not on site
<br />when projeet/gtarts there will, be a extra -charge to install.
<br />7. A11 form/work, concrete, and rebar for cast iace
<br />concrete work by others.
<br />_S. Trash in designated area or dumpster
<br />j provided by nth
<br />***• 9. /ali Exterior block on bldgs.l & 2 fig�,txed to be high
<br />/ strength block, all interior & out bldgs., retaining
<br />wallsfigured to be regular strength block,
<br />/ Per Bob- Burbrink on 9/22/o5.
<br />YYCa N'u a *- IWM
<br />PLANS DATRpc 5/G8/05 GOOD THRUI 12/30/05 BIDDS[d: MR
<br />RECENED
<br />APR 17 20H
<br />TURNER
<br />
|