My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-160
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 1:45:20 PM
Creation date
9/30/2015 9:42:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
05/16/2006
Control Number
2006-160
Agenda Item Number
7.Z.
Entity Name
Turner Construction Company
Subject
Change Order #009 - GMP Shell Allowance
Area
New County Administration Bulding
Supplemental fields
SmeadsoftID
5629
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New County Administration Building December 13, 2005 <br />Vero Beach, Florida <br />SCOPE OF WORK <br />for <br />Bid Package 6 — Custom Casework <br />a18':x., It is the responsibility of this subcontractor to have qualified personnel availabre to <br />accompany any authorities inspecting the project relating to his work. <br />19. Al submittals to be submitted in complete packages with specificatipa{sections and <br />paragraph'n-umbers noted in quantity, format, and forms as directed b Turner. <br />20. Contract Sum incl •des all Sales Tax and Insurance. <br />21. This subcontractor shail,protect existingfacilities, struggt res, adjacent property and the <br />public. This subcontractor' solely responsible for jokf,safety associated with this scope <br />of work, construction procedu s, and damage or 1 ury due to its act or neglect. <br />22. Electric service for welders will not Yback;jn�gfor <br />fe. <br />C. EXCLUSIONS <br />1. Furnishing and installing blocking aq the attachment of the custom casework <br />— by drywall subcontractor �/1 <br />2. Custom casework in the fell ng spaces is not includgd in the scope of the work. These <br />items may be added by c nge order to the scope of wv r' C at a late date: Rooms 1.1-101, <br />1.1-102, 1.1-116, 1.1- 51 1:1-3031 1.1-408, 1.1-411, 1.12501, 1.2-511, 1.2-512, 1.2-613, <br />1.2-7043 1.2-705, 1. -801, 1.2-803, 2.1-2027 2.1-303, 2.1-4 2.1-604, 2.1-622 and 2.2- <br />302. <br />/Interior <br />shown plan in the following spaces are interpreted to be wner Furnished and <br />Ins led furniture and are not part of this scope of work: Roo 1.1-201, 1.1-2027 <br />3, .1-302, 1.1-405,1.1-407,1.1-408, 1.2-106, 2.1-201, 2.1-218, A-4013 2.1-409, <br />, 2.1-503, 2.1-601, 2.1.603, 2.1-624, 2.1-627 and 2.2-315. <br />seating at the Commission Chamber—by seating subcontractor. <br />ail with wood cap at the Commission Chamber - by ornamental handrail an <br />subcontractor. <br />of elevator cabs — by elevator subcontractor. <br />j 7. In wall steel bracket, if required, for support of bathroom vanities — not shown on <br />L/ drawings. <br />8. Koral Kast chair rail and Koral Kast columns, bases and capitals — by Koral Kest <br />subcontractor. <br />'1 D. ALTERNATES <br />1. The Subcontract Amount includes all work Indicated in the Deduct ($7,406.00) <br />Contract Documents. It is ifre Owner's intention to revise the <br />documents to shell the area presently indicated as the location ��II <br />for the Emergency Operations Center (EOC), along with related �� t�P <br />mechanical, electrical and structured cabling systems. The <br />following amount represents the value of the Custom Casement / <br />Project #1153100 IV] Is <br />File/CSI #06410 Custom Casework Sub <br />Subcontract Agreement #1153100-033 — Wood Company TCCo <br />Page 6 of 7 <br />CP ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.