My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263D
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:54:51 AM
Creation date
9/30/2015 11:03:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/20/2007
Control Number
2007-263D
Agenda Item Number
County Administrator Signature
Entity Name
Donadio & Associates
Subject
Punch List Building 2 - 1st Floor - Property Appraiser
Area
New County Administration Building
Supplemental fields
SmeadsoftID
6492
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Administration Complex <br /> Property Appraisers Office - Punch List - Friday - 07/06/07 <br /> July 10, 2007 <br /> Page 11 <br /> Work Room 621 (continued) <br /> 4. Opening leading to Corridor 612 bottom right and left sides need to be repainted and vinyl base needs to make <br /> sure it is secured to the corners. <br /> 5. Electrical outlet the drywall to the top left/right, top left of electrical outlet cover to the left of the opening <br /> leading into Corridor 624 drywall is damaged, needs to be patched and repaired. <br /> 6. Ceiling tile is chipped coming off the left opening leading into Corridor 624, the 4h tile off the left opening, <br /> file is chipped . Also, to the left of that same tile, one single tile not setting flush in the grid. <br /> 7. This area above the door opening leading into 624 Office 621 ceiling tile does not seem to be level, the grid <br /> does not seem to be level, very irregular. <br /> & Ceiling tile is chipped, the 4 h ceiling file off the north wall and two ceiling tiles to the right of the right corner <br /> of the opening leading into Corridor 624. <br /> Comauter Room 623 <br /> 1 . Drywall to the right and left of Door 617A on the inside needs to be sanded and repainted. That is also true of <br /> the drywall above the vinyl base to the right of Door 617A . <br /> 2. All walls need to be touched-up with paint where there is dirt and fingerprints, etc., and vinyl base needs to be <br /> cleaned of scuff marks, paint, etc . <br /> 3 . Door 623A — Bottom right of Door 623A drywall needs to be sanded and repainted and vinyl base needs to be <br /> re-secured to the wall. <br /> 4. Left side of hollow metal frame drywall where it abuts the frame needs to be sanded and repainted. That is <br /> also true at the head where the drywall abuts the head of Door 623. <br /> 5. Electrical outlet to the left of Door 623 needs to be sanded and repainted, patched and repaired, chips around <br /> the opening of the electrical outlet cover plate. <br /> 6. Borrowed light 623 BL right side drywall jamb and drywall needs to be sanded, caulked and repainted. That <br /> is also true of the bottom left jamb the head where it abuts the drywall needs to be sanded, caulked and <br /> repainted. Also, the underside of borrowed light BL1 623 drywall needs to be sanded, caulked and repainted. <br /> 7. Electrical outlet cover to the bottom left of borrowed light 621 BLl drywall is irregular, needs to be sanded <br /> and repainted . <br /> 8 . North wall electrical outlet to the right of the FM200 Canister drywall is rough and irregular needs to be <br /> sanded and repainted. <br /> 9. Plywood back boards needs to be repainted with fire retarded paint where the paint finish has been chipped. <br /> 10. Ceiling grid directly in front of the electrical panel on the south wall, 5's grid off the electrical panel , finish is <br /> damaged. <br /> Production Room 625 <br /> 1 . Furniture in place in this office. <br /> 2. Transition strip needed between carpet and VCT floor tile. <br /> 3. Drywall opening 625 leading into Production Room outside edges needs to be sanded and repainted, and vinyl <br /> base needs to be secured to the wall . <br /> 4. Vinyl base needs to be cleaned of drywall mud, dirt, debris and paint. <br /> 5 . South wall left inside corner by the boxed out column drywall mud on the VCT needs to be removed. Also in <br /> this area VCT is cut too short. <br /> 6. VCT has glue, drywall mud, scuff marks, etc . throughout. <br /> 7 . North wall above the right electrical outlet the drywall needs to be touched-up with paint. Also, in this <br /> general area scuff marks on the VCT flooring. <br /> 8. To the right of the opening off Corridor 624 fingerprints need to be touched-up with paint. <br /> 9. Ceiling tile about the center of the east wall, I " full ceiling tile off the wall is chipped. <br /> 10. Light fixture at the north end off the east wall by the return air grille lens diffuser is damaged. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.