Laserfiche WebLink
09 / 24 / 04 FRI 10 : 41 FAX 15818417819 KHA FIRKWIDE 14002 <br /> k <br /> Attachment 1. <br /> Pniect Description and Understtuadint <br /> Construction of a new master pump station is slated under Indian River County Utilities (IRCU) CIP <br /> project it WW012 which will act as a repump station directing wastewater flow to the North Regional <br /> WWTP. This pump station would allow redirection of current flows from the Chesser Gap pump station <br /> east along CR510 to the NR WWTP. Additionally, in anticipation of future flows from Fellsmere, this <br /> pump station should be sized accordingly 1.0 accept City of Fellsmere flows and future development <br /> estimated to be approximately 6800 ERU' :; <br /> The project will include cutting into the existing forcemain along CR 510 and direoting flows to the new <br /> pump station to be located at the and of 64 " Avenue on the Douglas school property. The pump station <br /> discharge would be redirected to the CR 510 forcemain allowing pumping to the NR WWTP. The school <br /> is offering the site up for use in anticipation of abandoning their drainfield and extending gravity sewer to <br /> the pump station. The design of the pump station should consider this tie-in. <br /> Normal anticipated flows for the pump station are expected to range from 1000 span to 2000 gpm with <br /> initial flows being much less. The design of the station should consider either the use of VFD' s to <br /> account for the wide range of flows or an allowance for a triplex (three pumps) station with initial <br /> construction to only include a duplex (two pumps) station. Modeling scenarios, using IRCU 's existing <br /> sewer systema hydraulic model will be evaluated to identify the ideal recommended option . <br /> The station should also include odor control facilities similar to the systerns 1RCU currently operates. A <br /> Biocube type system should be designed to handle odors from the pump station. The station should also <br /> include backup auxiliary power using dim: l driven generator with an automatic transfer switch. Radio <br /> telemetry will be included for remote monitoring and control and match IRCU's standard. It is assumed <br /> that Data Flow system will be specified . <br /> SCOPE OF SERVICES <br /> Consultant will provide survey of the site and 64's Avenue for the construction ofnew forcetnain and <br /> pump station. Consultant will prepare project drawings and specifications for the project which can be <br /> advertised for bidding by general contractus. Consultant will prepare and submit the appropriate permits <br /> listed herein for the construction of the project. Consultant will provide construction phase services <br /> during construction, witnessing startup and operational testing, and provide final certification of the <br /> facility. The scope includes the following: <br /> Task .1 — Survey <br /> KHA will provide survey of the site and 64'b Avenue where the master pump station will be located and <br /> for the influent and effluent piping located along 60 Avenue up to CR 510. The site survey will include <br /> a boundary survey for easement transfer with the adjacent school (Douglas Magnet County school ) which <br /> will also include at least a 100 'x 1. 00' area., topo, and other above ground information. Itis anticipated <br /> that the site granted to Utilities will be approximately 50 ' x50 ' . For the forcemain piping along 640' <br /> Avenue, approximately 600 ' of survey incl uding centerline baseline with 50 ' offsets, 50 ' topo with 100 ' <br /> stationing, edge of pavement, existing utilities, and benchmarks (2) will be included. Right of way <br /> information will be included in the survey . It is assumed that Utilities will provide locates of their <br /> existing lines at the intersection and along (4s Avenue. <br /> Task 2 ,, Design <br /> The design will include hydraulic evaluation , pump station design, pipe sizing, preparation of drawings <br />