My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-239
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 10:51:52 AM
Creation date
9/30/2015 8:17:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/12/2004
Control Number
2004-239
Agenda Item Number
11.J.3
Entity Name
Kimley-Horn and Associates Inc
Subject
Work Order No.2 Lift Station at Old Douglass School
Area
CR 510 64th Ave.
Archived Roll/Disk#
3224
Supplemental fields
SmeadsoftID
4573
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09 / 24 / 04 FRI 10 : 42 FAX 15618417819 KHA FIRMWIDE 003 <br /> and specifications for a master pump station, plan and profile of influent and effluent pipes to the pump <br /> station, and electrical and controls design. <br /> Consultant will utilize the existing sewer system master plan hydraulic model prepared by PBSJ to <br /> establish future flows and hydraulics of the sewer system and determine present and future configuration <br /> and operation of the pump station for pump sept size selection. An evaluation including the use of <br /> variable frequency drives (VFD) will be performed since present and future conditions of pump station <br /> operation may be significantly different An alternate design of using a triplex station with three pumps at <br /> buildout conditions will be evaluated in eoirjunction with the VFD design. <br /> The design will include odor control similar to the other lift stations in Indian River County. It is <br /> assumed that Bioeube or equal will be specified for this station. <br /> Construction drawings will be prepared which will include site plan, plan/profile of the foreemains along <br /> 64'b Avenue, details, and electrical for the pump station. It is assumed that approximately 14 drawings <br /> will be prepared. Consultant will provide copies of technical specifications, frill size (2406) and half <br /> size ( l 1x17) drawings for the Owner' s for bidding and construction. All plans and technical <br /> specifications will be provided to the Owner in electronic format (AutoCAD 2000 / MS Word, <br /> respectively) at the end of the project. The technical specifications and standard details will be based on <br /> the Owners current Utility Standards. <br /> We will coordinate with FPL regarding power requirements and improvements necessary for electrical <br /> service to the new station. h is assumed that 3 phase 480 volt power will be necessary. <br /> Electrical design will include itaain electrical service and coordination with FPL, pump starter and control <br /> panel, telemetry, lighting, evaluation of VFD design, and preparation of drawings and specifications for <br /> bidding. <br /> Task 3 — Permitting <br /> Consultant will prepare and submit a FDEP permit application 62-604.3000(8)(a) for the collection <br /> system modifications. The permit application fee of $500 will be included under this scope and paid by <br /> Consultant. Consultant will submit the pertnit application when the drawings and specifications are <br /> complete. Consultant will respond to one request for additional information (RFI's) from FDEP. <br /> Due to work which will be performed within CR 510 right of way, we will prepare and coordinate IRC <br /> R/W review permit and respond to questions regarding same, It is assumed that any fees associated with <br /> this permit will be waived and/or handled through interoffice coordination. <br /> Task 4 —Construction Phase Services <br /> Consultant will provide construction phase services for this project, including bidding and contract <br /> administration, shop drawing review, coordination and meeting attendance, constriction observation, <br /> start-up services, preparation of record drawings, including electronic format in AutoCadd R14 version in <br /> real world coordinates on CD, mylars, and final certification of completion of the project. It is anticipated <br /> that the duration of construction phase (notice to proceed to final completion) will be four (4) months and <br /> that on-site construction observations will he as appropriate with the level of constriction activity. <br /> Consultant will answer contractor questions; and prepare addendums, as needed which will be distributed <br /> to all the contract docuntemt holders. Consultant will attend a pre-bid meeting at the project site or main <br /> office. Consultant will sell project manuals from our office, including drawings, specifications, and <br /> generation of all addendums. <br />
The URL can be used to link to this page
Your browser does not support the video tag.