Laserfiche WebLink
PAGE TWO <br /> Terry stated that for this project she is the Project Manager, Brian Good with Kimley-Horn is <br /> the Project Engineer and Rick Mathis with the County is the Senior Inspector for the project. <br /> ' Terry asked if there were any questions or problems . Dick Destein asked when the last date for <br /> questions was . Brian stated the cut off is seven (7) days prior to the bid opening . Bill Yoder <br /> asked if there was a fax number. Brian ' s fax number is (772) 562-9689 and his phone number is <br /> ' (772) 794-4083 . Brian stated if sending a fax please follow up with a phone call to verify that he <br /> received the fax . <br /> Dick Destein asked the length of the project. Terry stated the length of the project is one- <br /> hundred eighty ( 180) days . Dick Destein asked the estimated value of the construction. Terry <br /> stated 2 . 2 million. <br /> Brian stated there is a minor amount of utility work on the project. Brian stated no matter if the <br /> ' contractor is doing the utility work or subbing the work out, the contractor doing the utility must <br /> have a copy of the Indian River County Utility Specifications . Brian stated the IRC Utility <br /> Specifications are included by reference in the Contract. <br /> Eric Kishel asked what time the bid was due on June 4, 2003 . Terry stated by 2 : OOPM . Terry <br /> stated the bid packets. go to the Purchasing Department and the packets must be sealed. The bid <br /> packets will be stamped in. No bid packets will be received after 2 : OOPM. <br /> In closing, Terry requested that all questions prior to the bid opening be sent in writing to Brian <br /> Good. The questions with responses will be sent to all plan holders . <br /> 1 <br /> ' F:\Public Works\Capital Projects\Oslo - 43rd Avenue\Meetings\PreBid5-20-03 .doc <br />