My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-226
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2016 11:38:40 AM
Creation date
10/1/2015 3:46:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/08/2009
Control Number
2009-226
Agenda Item Number
8.R.
Entity Name
G.K. Environmental Inc.
Subject
Oslo Boat Ramp Work Order No.1
Project Number
0381
Supplemental fields
SmeadsoftID
10762
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order # 1 GK Environmental , Inc. <br /> Oslo Road Boat Ramp <br /> September 8 , 2009 Agenda <br /> Page 2 of 5 <br /> TASK III — Benthic and Fish Surveys <br /> ( $ 3 , 520 . 00 ) <br /> PHASE III : Benthic invertebrates and fish sampling will be completed in channel area and adjacent <br /> mosquito control ( ease / west ) ditches . Results of these surveys will be presented in <br /> report form . Fish traps , seines , cast & dip nets and sediment coring devise / ponar <br /> grab sample will be used to collect data . Benthic samples will be filtered through sieve <br /> and contents identified . <br /> TASK IV — Revised Mitigation Plan <br /> ( $ 33300 . 00 ) <br /> PHASE IV : CONSULTANT will meet with COUNTY and permit agency staff to discuss mitigation <br /> options and inspect potential mitigation sites for compatibility and prepare a draft <br /> mitigation plan , based upon the ecological values of wetland impacts . <br /> TASK V — Uniform Mitigation Assessment Method ( UMAM ) <br /> ( $ 21860 . 00 ) <br /> PHASE V : CONSULTANT will conduct a Uniform Mitigation Assessment Method ( UMAM ) and /or a <br /> Wetland Rapid Assessment Procedure (WRAP ) of the wetlands located within the <br /> boundaries of the project site . UMAM /WRAP determines a numerical value for the <br /> ecological functions and ecological values of the existing wetlands and mitigation site . <br /> The UMAM/WRAP score can be used to determine what type / amount of mitigation will <br /> be required for the project site . The UMAM/WRAP score is based on vegetation , wildlife <br /> usage , hydrology , soils , water quality , success factor , and adjacent property . <br /> TASK VI — Revised Protected Species Survey <br /> ( $ 21750 . 00 ) <br /> PHASE VI : CONSULTANT will complete a detailed protected species survey on the referenced <br /> site . CONSULTANT ecologist will conduct a preliminary systematic survey for protected <br /> species in accordance with Florida Fish and Wildlife Conservation Commission <br /> ( FFWCC ) Guidelines . CONSULTANT ecologist will record all observations of listed <br /> protected species and features that may indicate species presence . Physical features <br /> may include , but are not limited to , tree markings , burrows , tracks , nests , scat , and <br /> cavity trees . CONSULTANT will request that the U . S . Fish and Wildlife Service ( FWS ) <br /> and the Florida Fish & Wildlife Commission ( FFWCC ) review their files for the presence <br /> of any listed species that may be present onsite . <br /> TASK VII — Revised Vegetation Survey ( FLUCCS ) <br /> ( $ 880 . 00 ) <br /> PHASE VII : CONSULTANT will conduct a systematic survey of vegetation using the Florida Land <br /> Use, Cover and Classification System (FLUCCS) , A Technical Report. FLUCCS was <br /> developed by the State of Florida , Department of Administration , Division of State <br /> Planning , Bureau of Comprehensive Planning , April 1976 . CONSULTANT ecologist <br /> will base the vegetative community descriptions upon field survey observations , SCS <br /> soil maps , and aerial photograph interpretation . <br /> F : \Engineering\Capital Projects\0381 Oslo Road Boat Ramp\GK Environmental\Work Order No . 1 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.