My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-158
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 2:56:03 PM
Creation date
9/30/2015 6:37:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/01/2003
Control Number
2003-158
Agenda Item Number
11.G.2.
Entity Name
Carter Associates, Inc.
Subject
Oslo Road Boat Ramp Facility Work Order 3A and 3B
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3294
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
View images
View plain text
Location/Mapping of the existing Sea Grass areas or areas of environmental concern from the MHW line <br /> to Right- of —Way of the Inter-coastal Waterway. I. R. C . and/or a Sub-Consultant shall supply delineation <br /> of environmental area ( Sea Grass) within the Indian River . (To be established prior to commencement <br /> with phase two) . <br /> Our survey will be performed and prepared in accordance with the survey requirements of the Minimum <br /> Technical Standards (M.T. S . ) set forth by the Board of Professional Surveyors and Mappers, pursuant to <br /> Section 472 . 027 , Florida Statutes and Chapter 6 1 G 17, Florida Administrative Code . <br /> Based on our review of the existing survey data, right-of-way maps, property appraiser' s maps, aerials <br /> and the existing conditions of the site, we estimate the cost to perform the required field tasks and prepare <br /> the necessary survey certificates to be the following : <br /> 1 . Topographic Survey <br /> La. Field Work (GPS — 3 men/2 unit) 74 . 0 hours @ $ 125 .00/hour $ 9,250 . 00 <br /> Lb . Office/CARD 40 . 0 hours @ $ 50 . 00/hour $ 25000 . 00 <br /> l . c . PSM II 20 . 0 hours @ $ 90 .00/hour $ 1 , 800 . 00 <br /> Subtotal — Topographic Survey $139050.00 <br /> 2 . Site/Staff meetings <br /> Onsite inspection/IRC Staff meeting 4 . 0 hours @ $ 90 . 00/hour $ 360 . 00 <br /> Subtotal - Site/Staff meetings $ 360.00 <br /> Not-to-Exceed - Total Compensation (Phase Two) $ 139410. 00 <br /> Carter Associates, Inc . , in the course of performing these survey tasks , will adhere to the <br /> safety <br /> procedures and guidelines for surveyors for water/boat navigation as set forth in the most current <br /> publication prepared by the Florida Department of Transportation (F . D . O .T .). <br /> Carter Associates, Inc . estimates the time frame to complete Phases One and Two to be eight to ten weeks <br /> from the notice to proceed (depending on the weather) . Should the county decides to proceed with both <br /> phases , we have the manpower to perform the above described tasks concurrently. <br /> Trusting you find this information to be in order and sufficient for consideration, and looking forward to <br /> the possibility of providing these services to you, I remain, <br /> Very truly yours, <br /> CARTERXAIATM,David E . , <br /> cc : Marvin E . Carter, P . S .M. <br /> Dean F . Luethje, P .E . <br /> S :\P\03-422S\DOCS\03-422S_ircwo3 . doc 5 <br /> Servhig Florida <br /> Since 1911 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).