Laserfiche WebLink
• <br /> • 1 <br /> _ Subtotal — Project Control $ 3,040 .00 <br /> 2. Topographic Survey <br /> 2 . a Field Work 64. 0 hours @ $ 95 .00/hour $ 65080 . 00 <br /> 2.b Office Work 56 . 0 hours @ $ 50 . 00/hour $ 25800 . 00 <br /> 2. c PSM Il 16 .0 hours @ $ 90 .00/hour $ 13440 . 00 <br /> Subtotal - Topographic Survey $ 10,320 . 00 <br /> 3 . Site/Staff meetings <br /> Onsite inspection/IRC Staff meeting 4.0 hours @ $ 90.00/hour $ 360. 00 <br /> Subtotal - Site/Staff meetings $ 360. 00 <br /> 4. Materials : $ 100 .00 <br /> Concrete monuments <br /> Rebars <br /> Lathes <br /> Blueprints/Copies <br /> Not-to-Exceed - Total Compensation (Phase One) $ 135820.00 <br /> PHASE TWO (INDL4NRIVER) <br /> Limits <br /> From MHW of the Indian River to Right-of--way line of the Inter-coastal Waterway: 200 ' Corridor <br /> - 100 ' North and South of physical centerline of existing channel as it exist. +/- (3700 Feet) <br /> PROJECT CONTROL : <br /> Baseline/Control and Benchmarks are to be referenced to previously establish landside control. <br /> Horizontal Control shall be tied into State Plane coordinate system utilizing either I.R. C. or City of Vero <br /> GPS monuments. Coordinates shall be shown on all major intersections with right—of -ways and or <br /> property lines. <br /> TOPOGRAPHIC/HYDROGRAPHIC SURVEY: <br /> Cross-Section (Soundings) at 100 ' stations, offset 100 ' left and right of existing centerline of channel. <br /> Locations of all existing spoil mounds, sand bars, channel markers or Buoys indicating the channel or <br /> navigable waterway (or obstruction of). <br /> Channel Markers shall depict horizontal position (Coordinates) . <br /> ENVIRONMENTAL SURVEY (SUPPLEMENTAL) — <br /> * * *Environmental services and associated surveying tasks not included in this proposal* * * <br /> S :\P\03422S\DOCS\03-422S_ircwo3 .doc 4 <br /> Serving Florida <br /> Since 1911 <br />