My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-158
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 2:56:03 PM
Creation date
9/30/2015 6:37:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/01/2003
Control Number
2003-158
Agenda Item Number
11.G.2.
Entity Name
Carter Associates, Inc.
Subject
Oslo Road Boat Ramp Facility Work Order 3A and 3B
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3294
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) Drawing Sheet Size - Drawing sheet size shall be 24-inch by 36- <br /> inch. <br /> (5) Existing Utilities <br /> (a) Call out each existing utility in the following order: <br /> 1 . Type of utility ("high pressure gas main," high <br /> voltage electric lines, " "water, " "sewer, " "drainage <br /> culvert," etc .) <br /> 2 . Diameter <br /> 3 . Type of material <br /> 4 . Number of pipes/conduits , as applicable . <br /> (d) All existing utilities shall have the system-abbreviated text <br /> written into the line. (e . g . ------FM------ for a force main.) <br /> (e) Tie down the horizontal location of each utility. <br /> (f) Provide top-of-pipe (or invert) elevations at appropriate <br /> locations . <br /> (g) Screen existing utilities 60 percent. <br /> WORK ORDER NO. 3A - SECTION IV — TIME FOR COMPLETION <br /> The Work Order No . 2 shall be completed within 70 calendar days from Notice to Proceed. <br /> WORK ORDER NO. 3A - SECTION V — COMPENSATION <br /> The COUNTY agrees to pay, and the SURVEYOR agrees to accept, a fee for services <br /> rendered according to the " Scope of Services Provided by the SURVEYOR," identified in <br /> Section III of this WORK ORDER NO . 3A, with a maximum charge under this WORK ORDER <br /> of $ 13 , 820. 00 . See proposal attached . <br /> WORK ORDER NO . 3B - SECTION I — PROJECT LIMITS <br /> This Work Order is for a topographic survey for the INDIAN RIVER portion of the proposed <br /> Oslo Road Boat Ramp Facility. The SURVEYOR' S work will include but may not be limited <br /> to, Topographic Survey. The SURVEYOR' S work will be used by the COUNTY and/or the <br /> COUNTY ' S Stormwater Engineering Consulting Team for design and permitting of proposed <br /> boat ramp facilities . <br /> From MHW line of the Indian River to Right- of-Way line of the Inter-Coastal <br /> Waterway: 200 ' Corridor — 100 ' north and south of physical centerline of existing <br /> channel as it exists, 3 , 700 ' + . <br /> 3 <br /> F:\Engineering\Capital Projects\0138-Annual Survey Contract 2002-2003\0138 Work Order No. 3 , Carter-cjk.dot <br />
The URL can be used to link to this page
Your browser does not support the video tag.