Laserfiche WebLink
Our surveying services included in this proposal will consist of the following tasks as outline in the <br /> request for proposal. It is our intent to meet all County requirements as listed in the furnished scope of <br /> services: <br /> Minimum Specification Requirements : <br /> Purpose: <br /> The purpose of this project is to obtain and map as a "Topographic Survey" the projects existing <br /> Horizontal and Vertical datum and features as outlined in scope of services below of the corridor for <br /> design and permitting purposes. <br /> Reference Datum : <br /> Horizontal reference datum must be adjusted to NAD 1983/99 and derived (and/or tied to) from the <br /> existing Indian River County Horizontal Control (I.R.C.H. C .) or City of Vero ' s State Plane coordinate <br /> system in use at time of this project. A report of Indian River Counties G.P. S . control used shall be <br /> included in final submittal. (Include point status, condition and or comments benefiting the maintenance <br /> of said points) <br /> Vertical Datum, NAVD88 with a relative "Vertcon" conversion to NGVD29 placed on the cover sheet <br /> and each additional sheet. <br /> Deliverables: <br /> Preparation and submittal shall be in survey feet.' <br /> 24" x 36" sheets with accompanying electronic disc. In AutoCAD 2000 format. <br /> Key sheet depicting the projects location and overall information. <br /> Sheet depicting Horizontal and Vertical Control network with assigned values . <br /> Individual sheets with related topographic/Hydrographic/Environmental Survey information. <br /> The submitted survey shall be certified to Indian River County. <br /> S:\P\03-422S\DOCS\03-422S_ircwo3 .doc 2 <br /> -"fServing Florida <br /> Since K) 11 <br />