My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-088
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 11:39:30 AM
Creation date
9/30/2015 6:27:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
04/08/2003
Control Number
2003-088
Agenda Item Number
11.G.3.
Entity Name
Kimley-Horn & Associates, Inc.
Subject
Oslo Road Bridge Replacement and Road Widening-Amendment 1
Area
43rd ave
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3211
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No . 1 <br /> Oslo Road Bridge Replacements and Roadway <br /> Widening <br /> • The ENGINEER will also perform a pre-final walk through, review the record <br /> drawings, assist in establishing a punchlist, and perform a final walk through and <br /> certification. <br /> • The ENGINEER will assist with shop drawing review and field observation <br /> assistance beyond that described above on an hourly basis , when requested by The <br /> COUNTY . <br /> Roadway Construction Observation Assistance <br /> • The ENGINEER will attend the Pre- Construction meeting with regard to roadway <br /> construction for the Oslo Road/43rd Avenue construction project. <br /> • The ENGINEER will attend the bi-weekly progress meetings for up to 36 weeks . <br /> • The ENGINEER will respond to COUNTY and Contractor Requests for Information <br /> (RFI) <br /> • The ENGINEER will review the contractor submitted shop drawings . <br /> • The ENGINEER will review as -built drawings provided by the Contractor ' s licensed <br /> surveyor. <br /> • The ENGINEER will assist the COUNTY in conducting two , walk through <br /> inspections . One inspection as a final inspection and a second inspection as a follow <br /> up to clear punch list items . <br /> • When requested by the COUNTY, the ENGINEER will review Contractor proposed <br /> plan alternatives . This work will be undertaken as an additional service and the fee <br /> will be calculated at an hourly rate along with expenses . <br /> • At the request of the COUNTY, the ENGINEER will provide CADD assistance to <br /> input Contractor supplied As-Built data into the project electronic files . The <br /> ENGINEER will undertake this effort at an hourly rate . <br /> Utility Construction Observation Assistance <br /> • The ENGINEER will review the Contractor submitted shop drawings and material <br /> specification sheets . <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.