My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-179
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 9:28:18 AM
Creation date
10/1/2015 3:40:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
06/23/2009
Control Number
2009-179
Agenda Item Number
8.D.
Entity Name
Kimley-Horn Associates
Subject
Amendment No.3 to services agreement
Oslo Road Widening Phase 2
Area
43rd Avenue to east of 27th Avenue
Supplemental fields
SmeadsoftID
10714
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No . 3 <br /> Oslo Road Widening from 43 "' Avenue <br /> to east of 27`t' Avenue <br /> F . Utility Improvement Plans : <br /> Based upon our understanding , the COUNTY does not desire to relocate the existing <br /> force main and water main facilities from their current location , such that they would not <br /> reside under the widened Oslo Road corridor, minor water main relocations will be <br /> needed to ensure fire hydrant access will be maintained along the corridor . The <br /> relocations will provide a fire hydrant access at no less than 500 linear feet along the <br /> corridor. <br /> The force main will be evaluated to ensure that future service connections are positioned <br /> along the corridor in anticipation of future connections and are equipped with a valve <br /> assembly such that interruption of service will not be required . <br /> G . Right- of-Way Acquisition Assistance : <br /> The ENGINEER will coordinate with the COUNTY and/or their legal consultant <br /> regarding the necessity for right- of-way acquisition associated with the Oslo Road and <br /> 27 `h Avenue corridors . Additional effort is anticipated in supporting the COUNTY ' S <br /> legal consultant in orders of taking and providing expert testimony to the engineering <br /> necessity associated with the 27 `" Avenue and Oslo Road corridors . <br /> " SECTION V — COMPENSATION " is being modified to incorporate the following : <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees inclusive of expenses in accordance with the following : <br /> A . Professional Services Fee <br /> The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY is as follows : <br /> Lump Sum Components <br /> Tasks Labor Fee <br /> Supplemental Stormwater Facility Survey $ 9 ,400 <br /> Roadway Plan Modifications $ 34 , 614 <br /> Drainage Design and Permitting $ 33 , 255 <br /> Signalization Design $ 7 , 210 <br /> Utility Improvement Plans $7 , 300 <br /> Sub -Total $91 , 779 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.