My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-030
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 10:16:42 AM
Creation date
9/30/2015 8:11:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/24/2006
Control Number
2006-030
Agenda Item Number
11.I.7.
Entity Name
Edlund, Dritenbas, Binkley Architects & Associates, P.A.
Subject
Parks and maintenance Complex design contract
Area
north side of 77th street, east of 58th avenue
Project Number
050605VB
Supplemental fields
SmeadsoftID
4463
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The COUNTY shall be responsible for acquiring all right-of-ways, easements and other <br />rights in land as necessary to complete the project. <br />C. The COUNTY shall be responsible for obtaining those pen -nits required to perform the work <br />to complete the project only if such permit requirements are established by regulatory <br />agencies after the date of this Agreement. <br />D. The COUNTY shall make provisions for the DESIGNER to enter upon public or private <br />property as required for the DESIGNER to perform his services. <br />E. The COUNTY will promptly prepare and execute all pen -nit applications necessary to <br />expedite the acquisition of any local, state or federal permits made necessary by the project. <br />F. The COUNTY designates the Public Works Director, or his designee, as Project Manager <br />for the Project. <br />G. The COUNTY shall provide the necessary surveys, topographic data, tree locations, utility <br />locations, and environmental studies. <br />H. The COUNTY shall provide a site plan to the DESIGNER depicting curb cuts, driveways, <br />circulation and parking, sidewalks, site data and site calculations. The format for this <br />documentation will be AUTO CAD 2004 or 2006, and shall clearly show the area for <br />placement of the three buildings required in the program data. <br />I. The COUNTY will provide a site plan conforming to FBC 2004 accessibility requirements <br />including site lighting, light pole locations, selected fixture manufacturer's photometric site <br />overlay, accessible route to public R.O.W., and accessible route to all buildings and required <br />entries and exits. <br />J. The COUNTY shall prepare all site structure designs, including but not limited to, flag pole <br />foundation, dumpster enclosure, grade level walkways, dunnage bins, curbing, wheelstops, <br />bollards, culverts, transformert pad, headwalls, monument signage, lot striping, and <br />detectable warning devices. All site structures shall comply with the wind pressure <br />requirements in FBC 2004 Edition for high velocity wind zones. <br />K. The COUNTY shall prepare the Instructions to Bidders, Invitation to Bid, and Specification <br />Sections for all work under their auspices. <br />L. The COUNTY shall execute and submit all permit applications, plan review applications, <br />and attend all meetings with agencies having jurisdiction and approval authority for this <br />proj ect. <br />M. The COUNTY shall prepare complete utility drawings for water, sewer, electric, phone, data <br />and stonnwater management requirements. All co-ordination with utility providers, design, <br />relocation or routing, and scheduling shall be by the COUNTY. <br />N. The COUNTY shall provide environmental studies and reports, traffic statements, or traffic <br />studies as required by agencies having jurisdiction on this project. <br />K <br />
The URL can be used to link to this page
Your browser does not support the video tag.