My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-030
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 10:16:42 AM
Creation date
9/30/2015 8:11:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/24/2006
Control Number
2006-030
Agenda Item Number
11.I.7.
Entity Name
Edlund, Dritenbas, Binkley Architects & Associates, P.A.
Subject
Parks and maintenance Complex design contract
Area
north side of 77th street, east of 58th avenue
Project Number
050605VB
Supplemental fields
SmeadsoftID
4463
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O. The COUNTY will be responsible for scheduling the design team meetings and co- <br />ordinating the construction documents generated by their sub -contractors involved in this <br />project. The COUNTY shall designate an individual for quality control checking of the <br />final production documents from their selected disciplines to identify conflicts of systems, <br />routes, clearances, specifications, completeness, conformity with Building and Life Safety <br />Codes, and local zoning ordinances. <br />P. The COUNTY shall designate individuals to perform periodic inspections for work <br />designed by their sub -contractors and approve that portion of the work by way of <br />applications for payment submitted monthly by the General Contractor. <br />Q. The COUNTY shall provide Landscape and Irrigation Designs conforming to local <br />ordinances and co-ordinate all underground chases, routes and clearances below walks and <br />drives. <br />R. The COUNTY shall provide geo-teclmical testing and reports for stormwater design by <br />others and the building foundation sizing by the DESIGNER. <br />S. The COUNTY shall select final colors for the interior and exterior finishes selected by the <br />DESIGNER. <br />T. The COUNTY shall maintain the As -Built drawings with the General Contractor awarded <br />the project. <br />SECTION IV - SCOPE OF SERVICES <br />The DESIGNER agrees to perform professional services in connection with the project as <br />required and as set forth in the following: <br />A. General <br />1 . The DESIGNER will endeavor not to duplicate any previous work done on <br />the project. After written authorization to proceed, the DESIGNER shall consult <br />with the COUNTY staff to clarify and define the COUNTY'S requirements for the <br />project and review all available data, after which, a meeting with the DESIGNER <br />and County will be held. <br />2. The DESIGNER will attend conferences with the COUNTY and its <br />representatives upon the request of COUNTY. <br />3. In order to accomplish the work described under this Agreement in the time <br />frames set forth in this Agreement, the DESIGNER will maintain an adequate staff <br />of registered Architects, Engineers, draftsmen, , and other employees on the work at <br />all times. <br />4. By executing this Contract, the DESIGNER represents to the COUNTY that <br />the DESIGNER is professionally qualified to act as the architect for the project and <br />is licensed to practice architecture by all public entities having jurisdiction over the <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.