Laserfiche WebLink
ATTACHMENT I <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> NORTH AND SOUTH WATER TREATMENT FACILITIES <br /> OFF -SITE WELL INSTALLATIONS <br /> SCOPE OF SERVICES (Continued) <br /> Task 3 — Well Outfitting and Raw Water Line Design <br /> The 60% contract documents and associated estimate of probable construction cost will be completed <br /> within 90 days of Notice to Proceed and receipt of all requested information from IRC staff. <br /> The 90% contract documents and associated estimate of probable construction cost will be completed <br /> within 60 days of receipt of written County comments on the 60% design . <br /> The bid documents and associated estimate of probable construction cost will be completed within 45 <br /> days of receipt of written County comments on the 90% design documents . <br /> Task 4 - Geotechnical Evaluation <br /> The geotechnical services for the project as described in Task 4 will be completed within 60 days of <br /> receipt of the Engineer's Notice to Proceed and County approval of the proposed boring locations . <br /> Task 5 — Permitting <br /> PBS &J ' s permitting services will be completed concurrent with the completion of final design bid <br /> documents described in Task 2 . <br /> Task 6 - Bidding Phase Services <br /> PBS &J ' S bidding phase services will be completed concurrent with the County ' s project bidding <br /> period . <br /> Task 7 - Construction Phase Services <br /> Construction Administration, Shop Drawing Submittal Reviews , Periodic Site Visits , Materials <br /> Testing, and Interpretations and Clarifications : <br /> Construction Administration, Shop Drawing Submittal Reviews , Periodic Site Visits, Materials <br /> Testing, and Interpretations or Clarifications of the Plans and Specifications will be completed <br /> concurrently with the Contractor ' s construction effort . The construction shall be initiated within 90 <br /> days of design completion and shall not exceed an 8 -month construction period . <br /> Record Drawings : Record Drawings shall be completed within 45 days of receipt of the complete as- <br /> built drawings from the Contractor. <br /> CAF/bw/U:\W0\Projects\IRC_W_WW2004\TA_CUP\01 _Proposa1s\New Wells\Attachment Ldoc <br /> Last Revised 8/23/2004 5: 05 PM <br /> 9 <br />