My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-223
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 1:17:48 PM
Creation date
9/30/2015 7:59:05 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> NORTH AND SOUTH WATER TREATMENT FACILITIES <br /> OFF-SITE WELL INSTALLATIONS <br /> SCOPE OF SERVICES (Continued) <br /> Task 7.4 - Periodic Site Visits <br /> PBS &J shall visit the project site at intervals appropriate to the various stages of construction, as the <br /> Engineer deems necessary to observe the progress and quality of the construction and its general <br /> conformance with the Contract Documents . This includes a site visit at the point of substantial <br /> completion for the purposes of assisting in final punch list preparation . A budget limit of 60 hours <br /> has been included for this task. <br /> Task 7. 5 - Construction Meetings <br /> PBS &J will attend up to 4 monthly construction progress meetings . <br /> Task 7 .6 - Record Drawings <br /> PBS&J shall prepare one reproducible set of record drawings for the County based solely on <br /> information provided by the Contractor. <br /> Task 7.7 - Start Up, Testing and Training Assistance <br /> PBS &J will provide assistance to IRC staff in the start up, testing and training of the constructed <br /> facilities as requested by IRC staff up to a budget limit of 24 hours . <br /> III. SCHEDULE <br /> Task 1 — Consumptive Use Permit Modification Application <br /> The hydrogeological and engineering services for the project as described in Task 1 will be <br /> completed within 90 days of receipt of the Engineer's Notice to Proceed and County approval of the <br /> proposed boring locations . <br /> Task 2 — Well Design and Drilling <br /> The hydrogeological and engineering services for the project as described in Task 2 for the well <br /> design will be completed within 60 days after successfully obtaining the CUP modification approval <br /> from the water management district . <br /> The hydrogeological and engineering services for the project as described in Task 2 for the well bid <br /> phase and development will begin after completion of the well design and as authorized by the <br /> County . PBS &J will coordinate schedule of their activities to correspond with the County ' s bid <br /> schedule and subsequently with the successful bidder ' s proposed schedule . <br /> CAF/bw/U:\WO\Projects\1RC_W_WW2004\TA_CUP\01_Proposals\New Wells\Attachment Ldoc <br /> P <br /> Last Revised 8/23/2004 5:05 M <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.