My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-223
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 1:17:48 PM
Creation date
9/30/2015 7:59:05 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> NORTH AND SOUTH WATER TREATMENT FACILITIES <br /> OFF-SITE WELL INSTALLATIONS <br /> SCOPE OF SERVICES (Continued) <br /> Task 6 - Bidding Phase Services for Well Outfitting and Piping <br /> Task 6. 1 - Document Distribution and Pre-Bid Meeting <br /> PBS&J will make up to thirty (30) copies of the final bid documents and deliver same to IRC staff <br /> for County use and as requested from bidders . IRC staff will distribute these documents to bidders . <br /> PBS &J will attend the pre-bid conference to assist IRC staff in answering potential bidder questions . <br /> Task 6.2 - Addenda Preparation <br /> It has been assumed that the bidding period (from issuance of invitation for bid to bid opening) will <br /> be thirty (30) calendar days . During the bidding period, PBS&J will receive bidders ' written <br /> questions from IRC staff, and prepare an addendum for distribution by IRC staff. For the purposes of <br /> budgeting this task, one addendum is assumed to be required. <br /> Task 7 - Construction Services for Well Outfitting and Piping <br /> Once authorized by IRC staff, PBS &J will proceed with the construction phase services described <br /> below by specific tasks . It is anticipated that the construction period will not exceed 8 months. <br /> The County will provide on-site observation services during construction and PBS&J is entitled to <br /> rely on such services without their own independent review. <br /> PBS&J shall not be responsible for construction means , methods , techniques , sequences or <br /> procedures , or for safety precautions and programs in connection with the work, and shall not be <br /> responsible for the County or Contractor(s) failure to carry out the work in accordance with the Plans <br /> and Specifications . <br /> Task 7. 1 - Construction Administration <br /> PBS &J will participate in construction administration activities such as telephone conversations, <br /> communication with key project personnel , etc . , up to the budget limit of 60 hours . <br /> Task 7 . 2 - Shop Drawing Review <br /> PBS&J shall review shop drawings , up to two times per submittal , for general conformance with the <br /> Plans and Specifications up to a maximum of 80 hours . <br /> Task 7.3 - Interpretations and Clarifications <br /> PBS &J shall provide clarifications and interpretations of the Plans and Specifications as requested up <br /> to a budget limit of 40 hours , including preparation of up to one change order . <br /> CAF/bw/U:\WO\Projects\IRC_W WW2004\TA_CUP\01 _Proposa1s\New Wells\Attachment Ldoc <br /> P <br /> Last Revised 8/23/2004 5: 05 M <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.