Laserfiche WebLink
ATTACHMENT 1 <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> NORTH AND SOUTH WATER TREATMENT FACILITIES <br /> OFF -SITE WELL INSTALLATIONS <br /> SCOPE OF SERVICES (Continued) <br /> Task 3 .4 - Construction Plans — Electrical and Instrumentation <br /> PBS&J will prepare construction plan sheets for providing electrical power to eachnew well site and <br /> allow remote control and operation of the new wells from its associated treatment plant. Power is <br /> expected to be separately supplied and metered to each site . Emergency power to these wells will be <br /> through plug-in receptacles from portable generation equipment already owned by the County. <br /> Control will be through additions to the plants ' existing telemetry system. Control specifications will <br /> include software modifications to the plant control system. <br /> Task 3 .5 - Specifications <br /> PBS&J will prepare technical specifications related to the project and will incorporate County <br /> standard "front-end" (Division 0- 1 ) specifications . <br /> Task 3 .6 - Cost Estimating <br /> PBS &J will prepare estimates of probable construction cost to be submitted with the 60% , 90% and <br /> bid documents . <br /> Task 3 . 7 - County Reviews <br /> PBS&J will submit up to 5 sets of progress contract documents at approximately the 60 % and 90% <br /> levels of completion . PBS&J will attend a single review meeting with IRC staff for each progress <br /> milestone . IRC staff will provide PBS &J a single set of written review comments prior to each <br /> review meeting. <br /> Task 4 - Geotechnical Evaluation <br /> The scope of the work will include drilling Standard Penetration Test (SPT) borings in general <br /> accordance with ASTM D 1586 with one boring for each new well site . A geotechnical report will be <br /> developed to make recommendations for design of the new enclosures . <br /> Task 5 - Permitting <br /> PB S &J will prepare and submit construction permit applications for both the North and South WTF ' s <br /> for addition of the new wells . PBS&J will respond to up to one request for additional information. <br /> PBS &J will prepare one permit application on behalf of IRC staff for a County building permit for <br /> the additional well enclosures . PBS&J will respond to up to one request for additional information. <br /> CAF/bw/U:\WO\Projects\IRC_W_WW2004\TA_CUP\01 _Proposals\New Wells\Attachment IAoc <br /> Last Revised 8/21/2004 5:05 PM <br /> 6 <br />