Laserfiche WebLink
EXIHIBIT A <br /> Facilities Maintenance Complex <br /> Indian River County, Florida <br /> Clarifications to: <br /> Plans and Specifications <br /> Project 9820 <br /> Division 1 —General Conditions <br /> 1. The General Conditions for the Facilities Maintenance Complex (FMC) are based on <br /> both sites running concurrently, with site 1 starting approximately 6 to 8 months after <br /> site 2. <br /> 2. Testing for soil compaction,paving, sub-grade, concrete, and pump mix <br /> to be performed by Owner. <br /> 3. Site 1 —All equipment and vehicles located at the north property line of site 1 to be <br /> removed by Owner. <br /> 4. Site 1 —Proctor Construction Company (PCC) will not be responsible for moving or <br /> storing of any furniture for Owner. <br /> 5. A $10,000.00 savings could be realized should Owner base Performance Bond on <br /> 100% of Contract value versus 125% of Contract value. <br /> Division 2—Sitework <br /> 1. Silt barrier for erosion control will remain in contract and only be used if <br /> necessary to prevent erosion. <br /> 2. Asphalt paving has been deducted from contract. Owner to provide and place asphalt. <br /> The deduct amount for both sites is $214,000.00. <br /> 3. The vertical curb has been reduced as per revised plan provided by Owner. The <br /> deduct amount for both sites is $53,000.00. <br /> 4. Striping and pavement marking to remain in contract. <br /> 5. Site 2—The sanitary sewer line and two (2) manholes to the south end of site by fuel <br /> depot has been deleted. <br /> 12/3/02 Page 2 of 7 <br />