My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-018
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:58:03 AM
Creation date
9/30/2015 6:15:54 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXIHIBIT A <br /> Division 2—Sitework Cont. <br /> 6. Site 2—Owner to supply and install permanent elliptical culvert piping at north <br /> boundary line of site along 41"street in a timely fashion as not to affect schedule of <br /> project. If needed Owner to provide temporary culverts and entrance drives for <br /> construction use. Head walls and piping excluded from PCC contract for a deduct of <br /> $13,000.00. <br /> 7. Site 1 —PCC is not responsible for the removal or disposal of any 55 gallon barrels. <br /> 8. Site 1 —PCC excludes the abatement of any asbestos, lead, or refrigerants if found, <br /> during the demolition or construction of project. <br /> 9. Site 1 —PCC is not responsible for the removal of hazardous materials or <br /> contaminated soil. <br /> 10. Site 2—The demolition of abandoned house located at the northwest corner of site is <br /> not shown in contract documents. There is a $5000.00 allowance for this item. <br /> 11. Site 2 Fuel Depot—Change fueling pump station from suction pumps to dispensers. <br /> 12. Add two (2)pump systems to off load tanker trucks into fuel storage tanks. <br /> 13. Change fuel storage tanks from concrete encased (fire guard) to double walled fire <br /> rated(flame shield). <br /> 14. Eliminate two (2) -12,000 gallon fuel storage tanks. <br /> 15. Change one (1)—20,000 gallon tank to a 30,000 gallon tank for unleaded gas. <br /> 16. One (1) 20,000 gallon tank to remain as specified for diesel. <br /> 17. Tank storage slab size has increased to accommodate size of 30,000 gallon tank. <br /> 18. Kiosk and oil shed have been deleted from scope of work. The lube cube and air <br /> station will be moved to the northeast island. This island will also be roughed in for <br /> future dispensers. <br /> 19. The canopy size has been reduced from 122' to 114'. The fascia has been reduced from <br /> 48"to 24". The deck gauge of canopy has changed from 20 to 24 gauge. <br /> 20. The number of lights used under canopy has been reduced from 16 lights to 8 lights. <br /> 21. All sod has been changed from floratam to bahia. <br /> 22. All fencing has been changed from vinyl to galvanized. <br /> 12/3/02 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.