My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-199
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 4:43:46 PM
Creation date
9/30/2015 9:46:14 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Polly Kratman GeoSyntec Consultants <br /> Indian River County <br /> 10 May 2006 <br /> Page 10 <br /> • interpretation of the subsurface conditions including soil stratigraphy and ground <br /> water table conditions; <br /> • the potential presence of muck, previously filled areas, soft ground, lineaments, and <br /> sinkholes; <br /> • potential fault areas, seismic impact zones, and unstable areas ; <br /> • estimates of average and maximum high ground water table across the site; and <br /> • foundation analysis to evaluate the ability of the foundation to support the loads <br /> and stresses imposed by the proposed landfill expansion. <br /> This report will be prepared as a component of the permit application as required by <br /> Rule 62-701 . 330(3)(0, FAC . The report will be prepared and certified by a qualified <br /> geologist or engineer registered in the State of Florida. <br /> Task 3 — Desi2n and Permit Application <br /> GeoSyntec will design and prepare the permit application for submittal to FDEP for <br /> the Class I landfill expansion of the IRCL. The design will include the engineering <br /> analyses to demonstrate that the landfill expansion complies with the specific requirements <br /> of Rule 62-701 .400, FAC. The following activities will be performed to design the landfill <br /> expansion and prepare the permit application: <br /> • review existing permit application and other relevant reports and documents; <br /> • prepare conceptual plan for landfill development through end-of-life of the facility <br /> based on the initial site development plan prepared by CDM; <br /> • meet with FDEP to discuss the proposed expansion, including the design and <br /> permitting approach (this will be performed as part of Task 1 ); <br /> • prepare detailed phasing plans for the landfill expansion including plans for liner <br /> system, final cover system, and waste fill sequencing; <br /> • evaluate available storage volume and approximate timeline for landfill <br /> development; <br /> xc06096uL6007o.aoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.