My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-199
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 4:43:46 PM
Creation date
9/30/2015 9:46:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Proposal
Approved Date
06/06/2006
Control Number
2006-199
Agenda Item Number
14.B.2.
Entity Name
GeoSyntec Consultants
Subject
Proposal letter for design of a Class I Landfill Cell
Area
south of Oslo Rd
Supplemental fields
SmeadsoftID
5673
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms . Polly Kratman GeoSyntec Consultants <br /> Indian River County <br /> 10 May 2006 <br /> Page 12 <br /> GeoSyntec will prepare the application for a Class I Solid Waste Disposal Facility <br /> (Permit Application) . The Permit Application will include the engineering reports, permit <br /> drawings and operating plans required in accordance with Chapter 62-701 , FAC. The <br /> Permit Application will be signed and sealed by a registered professional engineer in the <br /> State of Florida. <br /> GeoSyntec will provide four complete copies of the Permit Application to FDEP and <br /> two copies to SWDD . An electronic file of the Permit Application will also be provided to <br /> FDEP and SWDD . <br /> Task 4 — ERP Modification <br /> GeoSyntec understands that one of SWDD ' s other consultants has preliminarily <br /> evaluated the adequacy of the existing stormwater management system to handle the <br /> additional stormwater runoff from the proposed Class I landfill and C&D disposal facility <br /> expansions. Under this task, GeoSyntec will analyze the effect of adding the proposed <br /> expansion area on the stormwater management system as currently designed and presented <br /> in the ERP . A modification to the ERP will be required for submittal to FDEP to account <br /> for any increase in the amount or timing of stormwater runoff due to grading changes or <br /> infiltration differences from the expansion final cover system or other changes to the site <br /> drainage systems. The ERP modification will also address the design of the relocation of <br /> the stormwater pond control structure. This task does not include any environmental <br /> considerations (i . e., wetlands, endangered species, etc.) associated with permitting of the <br /> Class I landfill expansion. It has been assumed that wetlands and other environmental <br /> issues have already been addressed as part of previous permitting of the overall 265 -acre <br /> facility. <br /> GeoSyntec proposes to initially meet with FDEP to discuss the proposed Class I <br /> landfill expansion and its impact on the existing stormwater management system . During <br /> this meeting GeoSyntec will confirm from FDEP the permit modification requirements to <br /> the existing ERP . For the purpose of the budget estimate, GeoSyntec has assumed that a <br /> minor modification to the existing ERP will be required. GeoSyntec will provide written <br /> responses to RAIs from FDEP on the ERP modification, if deemed necessary. For the <br /> purpose of the budget estimate, GeoSyntec has assumed that one response to RAI will be <br /> required. <br /> XL06096UL60070.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.