My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-199
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 4:43:46 PM
Creation date
9/30/2015 9:46:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Proposal
Approved Date
06/06/2006
Control Number
2006-199
Agenda Item Number
14.B.2.
Entity Name
GeoSyntec Consultants
Subject
Proposal letter for design of a Class I Landfill Cell
Area
south of Oslo Rd
Supplemental fields
SmeadsoftID
5673
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Polly Kratman GeoSyntec Consultants <br /> Indian River County <br /> 10 May 2006 <br /> Page 14 <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Tasks 1 through 5 of this proposal <br /> is summarized in the following table. The budget estimate does not include FDEP permit <br /> application fees . A detailed budget estimate is provided as Attachment A. <br /> • Task I — General Consulting/Meeting Support/Project Management <br /> • Task 2 — Hydrogeological and Geotechnical Investigations $38,525 <br /> • Task 3 — Design and Permit Application $ 108, 029 <br /> • Task 4 — ERP Modification $ 18048 <br /> • Task 5— Response to Regulatory Comments $37,955 <br /> $25,292 <br /> TOTAL <br /> $389,849 <br /> The budget estimate presented in this proposal is based on GeoSyntec' s understanding <br /> of the project requirements and experience with permitting similar facilities . GeoSyntec <br /> ficant geotechnical and hydrogeolgic data <br /> however understands that there may be signi <br /> available for the site. As previously discussed under Task 2, GeoSyntec will make every <br /> effort to utilize the available information and only supplement it, after discussions with <br /> FDEP, with the additional investigation required for permitting the proposed landfill <br /> expansion. <br /> GeoSyntec will not exceed the budget estimate without prior approval and written <br /> authorization from S WDD . GeoSyntec will provide monthly itemized invoices to S WDD . <br /> XL06096VL60070.dm <br />
The URL can be used to link to this page
Your browser does not support the video tag.