My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-175
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 1:40:13 PM
Creation date
10/1/2015 3:38:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/16/2009
Control Number
2009-175
Agenda Item Number
8.F.
Entity Name
MBV Engineering
Subject
Completion of required improvements Quail Creek Subdivision
Area
Quail Creed Subdivision
Supplemental fields
SmeadsoftID
10701
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A . Provide the ENGINEER with all available drawings , right- of-way maps , and other <br /> documents in the possession of the COUNTY pertinent to the project. <br /> Be The COUNTY shall make provisions for the ENGINEER to enter upon public and <br /> private property as required for the ENGINEER to perform his services . <br /> SECTION III - SCOPE OF SERVICES <br /> The ENGINEER agrees to perform professional engineering and related services in <br /> connection with the project as required and set forth in the following : <br /> 1 . Quantify Project Status : <br /> A . Surveyor to complete in- situ project as -built coordination with Stuart Houston . <br /> Be Generate Itemized Bid Tabulation . <br /> C . Coordination with County Staff regarding Bid Tab Sheet . <br /> D . Irrigation System Analysis . <br /> 2 . Contract Administration (Boiler Plate Documents Provided by IRC ) : <br /> A . Construction Bid Document Preparation <br /> 1 . Bid Sheets <br /> 2 . Grading Plans <br /> 3 . Bid Documents <br /> 3 . Contract Administration : <br /> A . Construction Inspection . <br /> Be Site Certification . <br /> C . As - Builts and Review/Coordination . <br /> SECTION IV - LIMITATIONS <br /> The following work tasks are specifically excluded with the understanding that the <br /> ENGINEER will provide a quote for any of these tasks if so requested by the COUNTY : <br /> 1 . Assistance with the project ' s bid or bid analysis . <br /> 2 . Construction management . <br /> SECTION V - COMPENSATION <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement a lump sum of $ 26 , 900 . 00 which includes direct costs . <br /> Billing will be monthly on a percent complete basis . . All billing for sub -consultants will <br /> be at direct cost in accordance with terms of this agreement . If at any time during the evaluation <br /> and design of the herein stated proposed services , it becomes apparent that the described scope of <br /> work changes , the ENGINEER will immediately notify the COUNTY , in writing , prior to <br /> making such changes . Such changes will be considered additional services requiring written <br /> authorization and will be provided on an hourly basis not to exceed the following rates : <br /> C : ADocuments and Settings\bow1esa01 \1,oca1 Settings\Temporary Internet Files\01,KF8\Quai1 Creek EOR Agreement (2). doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.