Laserfiche WebLink
FLORIDA EAST COAST RAILWAY COMPANY _civ ;en .wR, 01 /09/06 <br /> SAINT AUGUSTINE, FLORIDA 15 : 36 <br /> VERO BEACH : WIDEN THE EXIST. 74 ' WIDE TYPE "T" CONC. GRADE CROSSING WITH A 98 ' WIDE OMNI CROSSING. <br /> 16TH STREET, MILEPOST 228+118 ' AAR/DOT NO. 272195P <br /> FILE : 228/39/118 <br /> CROSSING DESCRIPTION PAVING DESCRIPTION <br /> New Length of Crossing Surface: 98 Tf Width (Across Road) 98 Ft <br /> Number of Tracks: I Ea Length (Along Road) 80 Ft <br /> Length of Track Panel : 138 Tf Projected Lift 3 In <br /> AGREEMENT DESCRIPTION GANG DESCRIPTION <br /> Responsible Party: Indian River County 3 Fort Pierce Section <br /> Agreement Date: Pending 14 Fort Pierce Smoothing <br /> Division of Responsibility 2 Crane <br /> Encase Fiber Optic Cable County 2 Loader <br /> Maintenance of Traffic County <br /> Crossing Surface County <br /> Track Materials County <br /> Track Construction County <br /> Paving County <br /> COST RECAPITULATION Salvage 10.00% Responsible <br /> Track & Civil Work Item Labor Equipment Material Contract Credit Contingency Total Party <br /> Encase Fiber Optic Cable n/a n/a n/a 7,500.00 n/a 800.00 8,300.00 County <br /> Mobilization/Material Consolidation 1 ,786.68 1 ,607.20 n/a n/a n/a 406. 12 39800.00 County <br /> Construct Track Panel 1 ,413 .50 1 ,336.68 119646 . 17 n/a n/a 1 , 503 .66 15 ,900.00 County <br /> Maintenance of Traffic/Police Protection n/a n/a n/a 16,700.00 n/a 1 ,700.00 18,400.00 County <br /> Remove Crossing Surface 463 . 12 579.33 n/a n/a 0.00 157.55 11200.00 County <br /> Remove/Replace Track/Crossing Structure 2, 648.23 3 ,237.39 n/a n/a 0.00 614. 38 61500 .00 County <br /> Line & Surface Track 851 . 82 651 . 83 8,352.00 n/a n/a 19044.36 10,900. 00 County <br /> Replace Crossing Surface 613 .32 767.22 31 ,731 . 80 n/a n/a 3, 387.66 363500. 00 County <br /> Place Asphalt 168 .50 28 .45 n/a 22,785 .00 n/a 29318.06 25 ,300.00 County <br /> Demobilization/Site Cleanup 469 .00 67.48 n/a n/a n/a 63 . 52 600. 00 County <br /> Totals : 8 ,414. 16 83275 .57 51 ,729 .97 462985 .00 0.00 11 ,995. 30 1279400.00 <br /> TOTAL TRACK PROJECT COST: $ 1275400.00 11300.00 $/Ft <br /> ENGINEERING & SUPERVISION: 5,096.00 <br /> TOTAL TRACK & CIVIL PROJECT COST: $ 1325496.00 <br /> TOTAL SIGNAL IMPROVEMENT PROJECT COST: 3579680.00 <br /> #REF ! <br /> TOTAL COST TO BE BORNE BY COUNTY: $490, 176.00 <br /> NOTE : THIS IS AN ESTIMATE ONLY, ALL CHARGES WILL BE BASED ON ACTUAL COST. Model Lost Revised 7/17/97 <br />