Laserfiche WebLink
JL <br /> FLORIDA EAST COAST RAILWAY COMPANY _s iit = I A-K4) 01 /09/06 <br /> SAINT AUGUSTINE, FLORIDA 15 : 36 <br /> VERO BEACH : WIDEN THE EXIST. 74' WIDE TYPE " T " CONC. GRADE CROSSING WITH A 98 ' WIDE OMNI CROSSING. <br /> 16TH STREET, MILEPOST 228+118' AAR/DOT NO. 272195P <br /> FILE : 228/39/ 118 <br /> CROSSING DESCRIPTION PAVING DESCRIPTION <br /> New Length of Crossing Surface: 98 Tf Width (Across Road) 98 Ft <br /> Number of Tracks : 1 Ea Length (Along Road) 80 Ft <br /> Length of Track Panel : 138 Tf Projected Lift 3 In <br /> AGREEMENT DESCRIPTION GANG DESCRIPTION <br /> Responsible Party: Indian River County 3 Fort Pierce Section <br /> Agreement Date: Pending 14 Fort Pierce Smoothing <br /> Division of Responsibility 2 Crane <br /> Encase Fiber Optic Cable County 2 Loader <br /> Maintenance of Traffic County <br /> Crossing Surface County <br /> Track Materials County <br /> Track Construction County <br /> Paving County <br /> COST RECAPITULATION Salvage 10.00% Responsible <br /> Track & Civil Work Item Labor Equipment Material Contract Credit Contingency Total Party <br /> Encase Fiber Optic Cable n/a n/a n/a 7,500.00 n/a 800.00 89300. 00 County <br /> Mobilization/Material Consolidation 1 ,786. 68 15607. 20 n/a n/a n/a 406. 12 3 ,800. 00 County <br /> Construct Track Panel 1 ,413 . 50 11336. 68 11 ,646. 17 n/a n/a 1 ,503 . 66 15 ,900.00 County <br /> Maintenance of Traffic/Police Protection n/a n/a n/a 16,700.00 n/a 11700.00 183400.00 County <br /> Remove Crossing Surface 463 . 12 579. 33 n/a n/a 0.00 157. 55 13200.00 County <br /> Remove/Replace Track/Crossing Structure 2 ,648 . 23 39237. 39 n/a n/a 0. 00 614. 38 6,500. 00 County <br /> Line & Surface Track 851 . 82 651 . 83 8,352 .00 n/a n/a 15044. 36 109900.00 County <br /> Replace Crossing Surface 613 . 32 767.22 315731 . 80 n/a n/a 35387.66 36,500.00 County <br /> Place Asphalt 168. 50 28.45 n/a 22,785 .00 n/a 2,318 .06 25 ,300. 00 County <br /> Demobilization/Site Cleanup 469.00 67.48 n/a n/a n/a 63 . 52 600.00 County <br /> ---------- ---------- ...-...... ---------- ---------- ---------- ---------- <br /> Totals : 8 ,414. 16 8,275 . 57 51 ,729.97 46,985 .00 0.00 113995 .30 1279400.00 <br /> TOTAL TRACK PROJECT COST: $ 127,400.00 1 ,300.00 $/Ft <br /> ENGINEERING & SUPERVISION: 59096.00 <br /> TOTAL TRACK & CIVIL PROJECT COST: $ 132,496.00 <br /> TOTAL SIGNAL IMPROVEMENT PROJECT COST: 3579680.00 <br /> #REF ! <br /> TOTAL COST TO BE BORNE BY COUNTY: $490, 176.00 <br /> NOTE : THIS IS AN ESTIMATE ONLY, ALL CHARGES WILL BE BASED ON ACTUAL COST. model Lest Re,;sed ,nr9i <br />