My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the required personnel, and that CONTRACTOR maintains adequate records <br /> thereof; observe, record and report to OWNER and ENGINEER appropriate <br /> details relative to the test procedures and startups . <br /> d . Accompany visiting inspectors representing public or other agencies having <br /> jurisdiction over the Project, record the outcome of these inspections and report to <br /> OWNER and ENGINEER. <br /> 8 . Interpretation of Contract Documents : Transmit to OWNER and CONTRACTOR <br /> ENGINEER' S clarifications and interpretations of the Contract Documents. <br /> 9 . Modifications : Consider and evaluate CONTRACTOR'S suggestions for modifications in <br /> Drawings or Specifications and report them with recommendations to OWNER and <br /> ENGINEER. <br /> 10. Records : <br /> a. Maintain at the job site orderly files for correspondence, reports ofjob <br /> conferences, Shop Drawings and samples submissions, reproductions of original <br /> Contract Documents including all Addenda, change orders, field orders, <br /> additional Drawings issued subsequent to the execution of the Contract, <br /> ENGINEER'S clarifications and interpretations of the Contract Documents, <br /> progress reports, and other Project related documents . <br /> b. Keep a diary or log book, recording hours on the job site, weather conditions, data <br /> relative to questions of extras or deductions, list of visiting officials and <br /> representatives of manufacturers, fabricators, suppliers and distributors, daily <br /> activities, decisions, observations in general and specific observations in more <br /> detail as the case of observing test procedures. Send copies to OWNER and <br /> ENGINEER. <br /> C . Record names, addresses and telephone numbers of all contractors, <br /> Subcontractors and major suppliers of materials and equipment. <br /> 11 . Reports : <br /> a. Furnish OWNER and ENGINEER periodic reports as required of progress of the <br /> Work and CONTRACTOR'S compliance with the approved progress schedule <br /> and schedule of Shop Drawing submissions. <br /> b. Consult with OWNER and ENGINEER in advance of scheduled major tests, <br /> inspections or start of important phases of the Work . <br /> C. Report immediately to OWNER and ENGINEER upon the occurrence of any <br /> accident. <br /> 12 . Payment Requisitions : Review applications for payment with Contractor for compliance <br /> with the established procedure for their submission and forward them with <br /> recommendations to ENGINEER, noting particularly their relation to the schedule of <br /> values, Work completed and materials and equipment delivered at the site but not <br /> incorporated in the Work. <br /> 13 . Certificates, Maintenance and Operation Manuals : During the course of the Work, verify <br /> that certificates, maintenance and operation manuals and other data required to be <br /> assembled and furnished by CONTRACTOR are applicable to the items actually installed ; <br /> and deliver this material to ENGINEER for his review and forwarding to OWNER prior to <br /> final acceptance of the Work. <br /> 14. Completion: <br /> a. Before OWNER issues a Certificate of Substantial Completion, submit to <br /> CONTRACTOR a list of observed items requiring completion or correction. <br /> b . Conduct final inspection in the company of ENGINEER , OWNER and <br /> CONTRACTOR and prepare a final list of items to be completed or corrected. <br /> 6706-43015- 155\ 10/ 17/07 00800- 19 VRB <br />
The URL can be used to link to this page
Your browser does not support the video tag.