Laserfiche WebLink
SECTION 01005 <br /> GENERAL REQUIREMENTS <br /> 1 .0 GENERAL <br /> 1 .01 PROJECT DESCRIPTION <br /> A . The principal purpose of this project is to retain a qualified water well CONTRACTOR <br /> capable of providing all services associated with the construction and testing of THREE <br /> 16-inch diameter production wells that withdrawal groundwater from the Upper Floridan <br /> aquifer for public supply use. The wells are expected to be drilled to a total depth of <br /> approximately 750 feet below land surface, with approximately 400 feet of 16-inch <br /> CERTA-LOK PVC final casing. Wellhead completion is limited to capping the well and <br /> disinfecting the well , if requested . The production wells (N-4 , N -5 , and N -6) will be <br /> located within the Wellfield at the North (Hobart Park) `JJater Treatment Plant (WTP) in <br /> Indian River County, Florida. <br /> B . The CONTRACTOR performing work covered by this contract shall be licensed by <br /> Indian River County to perform well work within the county, if required. The work <br /> covered by these specifications includes the furnishing of all materials ; labor, equipment, <br /> perennial and performing all operations in connection with the services as specified and <br /> shown on the drawings, complete. <br /> C . Specifications included in these bid documents establish the performance, quality <br /> requirements, location and general arrangement of materials and equipment, and establish <br /> the minimum standards for quality of workmanship and appearance . <br /> D . All well construction services will be performed by a State of Florida licensed water well <br /> CONTRACTOR able to demonstrate meeting all applicable standards set by the Florida <br /> Department of Environmental Protection (FDEP) , Saint Johns River Water Management <br /> District (SJRWMD), Indian River County Public Health Department (NCPHD), and <br /> American Water Works Association (AWWA) . <br /> E . The drilling CONTRACTOR will be responsible for securing and providing the OWNER <br /> or OWNER ' S representatives, proof of all secured permits and operating licenses as <br /> required by state and local agencies for the assigned work . No work will begin until all <br /> such permits are obtained and presented. <br /> F . All well construction activities will be initiated during normal working hours (7 :00 AM to <br /> 7 : 00 PM , Monday through Friday) or as approved by the ENGINEER. The OWNER, <br /> ENGINEER, and the regulatory agencies must be given 24 hours notice prior to anywork <br /> activities . <br /> GENERAL REQUIREMENTS <br /> 01005 - 1 <br /> C:\DOCUME—I\mikeh\LOCALS- 1\Temp\Temporary Directory 2 for IRC wells Div I .zip\02-lRC_GEN_REQ. DOC <br />