Laserfiche WebLink
3 . 1 . 13 Conduct static and dynamic geophysical logging of well <br /> including video survey. <br /> 3 . 1 . 14 Perform 8-hour variable rate ( specific capacity) pumping test. <br /> 3 . 1 . 15 . Collect water sample and analyze for Primary and Secondary <br /> Drinking Water Standards and operational parameters . <br /> 3 . 1 . 16 Wellhead completion, including disinfection and bacteriological <br /> clearance, if requested . <br /> 3 . 1 . 17 Demobilization and site restoration . <br /> 3 .2 LIST OF DRAWINGS : <br /> Drawing Drawing Title <br /> No. <br /> 1 Project Location <br /> 2 Production Well Construction Diagram <br /> 4.0 PAYMENT <br /> 4 . 1 GENERAL: Payment for all work, materials and equipment specified in this <br /> section will be included in the appropriate unit price or lump sum items as stated <br /> in the CONTRACTOR ' s Bid items and defined in the Measurements and <br /> Payment Section (Section 01026) <br /> END OF SECTION <br />