My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01026 <br /> MEASUREMENT AND PAYMENT <br /> 1 .0 GENERAL <br /> 1 . 1 WORK INCLUDED <br /> 1 . 1 . 1 The CONTRACTOR shall receive and accept the compensation per <br /> quantity provided in the Proposal and the Contract as full payment for <br /> furnishing all materials, labor, tools and equipment, for performing all <br /> operations necessary to complete the work under the Contract, and also in <br /> full payment for all loss or damages arising from the nature of the work, or <br /> from the action of the elements or from any unforeseen difficulties which <br /> may be encountered during the execution of the work until the final <br /> acceptance by the OWNER. <br /> 1 . 1 .2 The prices stated in the Proposal include all costs and expenses for taxes, <br /> labor, equipment, materials, commissions, transportation charges and <br /> expenses, patent fees and royalties, labor for handling materials during <br /> inspection , together with any and all other costs and expenses for <br /> performing and completing the work as shown on the Drawings and as <br /> specified herein . The basis of payment for an item at the price shown in <br /> the Proposal shall be in accordance with the description of that item in this <br /> Section . <br /> 1 .2 MEASUREMENT <br /> 1 . 2 . 1 The quantities for payment under lump sum items in this Contract will be <br /> in accordance with the CONTRACTORS bid price. <br /> 1 .2 . 2 The quantities for payment under unit price items in this Contract will be <br /> determined by actual measurement of the completed items in place or <br /> performed, ready for service and accepted by the OWNER. <br /> 1 .3 PAYMENT ITEMS <br /> 1 . 3 . 1 Item No . A- 1 : - Mobilization and Job-Site Preparation -Total Bid <br /> 1 . 3 . 1 . 1 Payment will be made at the Contract lump sum price for the item, <br /> which shall be full compensation for mobilizing all necessary <br /> equipment and personnel to the site, site preparation , clearing, and <br /> grubbing. <br /> Measurement and Payment <br /> 01026- 1 <br /> 04-IRC Measurel 10/17/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.