Laserfiche WebLink
1 . 3 . 10 Item No. A- 10 : Furnish and Install 16 -inch Diameter Certa-lok PVC <br /> Casing to Approximately 400 Feet bls- Total Bid <br /> 1 . 3 . 10 . 1 Payment will be made at the Contract unit price for the item, <br /> which shall be full compensation for providing all items necessary <br /> to install 16-inch diameter final casing to a depth of approximately <br /> 400 feet bls, including but not limited to, all materials, equipment, <br /> labor, and all other incidentals required to complete the work as <br /> shown on the drawings and included in the Specifications . <br /> 1 . 3 . 11 Item No. A- 11 : Cement 16-inch Diameter Certa-lok PVC Casing from <br /> Land Surface to Approximately 400 Feet bls- Total Bid <br /> 1 . 3 . 11 . 1 Payment will be made at the Contract unit price for the item , <br /> which shall be full compensation for providing all items necessary <br /> to cement 16-inch diameter final casing from land surface to a <br /> depth of approximately 400 feet his, including but not limited to, <br /> all materials, equipment, labor, and all other incidentals required <br /> to complete the work as shown on the drawings and included in <br /> the Specifications . <br /> 1 . 3 . 12 Item No . A- 12 : Drill Nominal 14-inch Diameter Borehole Hole from <br /> Bottom of 16-inch Casing to Approximately 750 feet bls Using Reverse <br /> Air Drilling - Total Bid <br /> 1 . 3 . 12 . 1 Payment will be made at the Contract unit price for the item , <br /> which shall be full compensation for providing all items necessary <br /> to drill a nominal 14-inch diameter bore hole from bottom of 16- <br /> inch casing to approximately 750 feet b1s, using reverse air <br /> drilling, including but not limited to, all materials, equipment, <br /> labor, and all other incidentals required to complete the work as <br /> shown on the drawings and included in the Specifications . <br /> 1 . 3 . 13 Item No. A- 13 : Install Pump Equipment for Development and Pumping <br /> Test — Total Bid <br /> 1 .3 . 13 . 1 Payment will be made at the Contract lump sum price for the item, <br /> which shall be full compensation for installing pump equipment <br /> for development, including furnishing, temporarily installing, and <br /> removing the pump, driver and associated discharge piping, <br /> valve(s), and meter(s). Payment shall also constitute full <br /> compensation for all time, materials, and equipment required to <br /> obtain , assemble and disassemble the equipment as described in <br /> the Specifications . <br /> Measurement and Payment <br /> 01026-4 <br /> 04-IRC Measurel 10/ 17/07 <br />