Laserfiche WebLink
1 .3 . 14 Item No . A- 14 : Develop the Well by Over-Pumping — Total Bid <br /> 1 . 3 . 14 . 1 Payment will be made at the Contract unit price for well <br /> development by over-pumping including but not limited to, all <br /> materials, equipment, labor, and all other incidentals required to <br /> complete the work as shown on the drawings and included in the <br /> Specifications . <br /> 1 . 3 . 15 Item No . A- 15 : Conduct Static and Dynamic Geophysical Survey of the <br /> Well - Total Bid <br /> 1 .3 . 15 . 1 Payment will be made at the Contract lump sum price for the item, <br /> which shall be full compensation for providing geophysical <br /> logging services of the well under static and dynamic flow <br /> conditions from land surface to approximately 750 feet bls, <br /> including but not limited to, all materials, equipment, labor, <br /> testing, and all other incidentals required to complete the work as <br /> shown on the drawings and included in the Specifications . <br /> 1 . 3 . 16 Item No . A- ] 6 : Perform Variable Rate Pumping Test <br /> 1 .3 . 16 . 1 Payment will be made at the Contract unit price per hour for the <br /> item, which shall be full compensation for operating the pump <br /> during the pumping test and all other incidentals required to <br /> complete the work as shown on the drawings and included in the <br /> Specifications. Payment will not include the hourly rate for <br /> pumping during the time the equipment is not actually in use or in <br /> the event the pumping test is not performed for the full duration of <br /> eight hours. <br /> 1 . 3 . 17 Item No. A- 17 : Collect Water Sample and Analyze for Select Primary and <br /> Secondary Drinking Water Standards and Other Parameters - Total Bid <br /> 1 . 3 . 17 . 1 Payment will be made at the Contract lump sum price for the item, <br /> which shall be full compensation for providing sampling bottles, <br /> purging the well , collection of the samples, conveyance and <br /> submittal of the samples to the Contractors approved laboratory <br /> and all other incidentals required to complete the work as shown <br /> on the drawings and included in the Specifications . Laboratory <br /> analyses for select parameters identified under the Primary and all <br /> Secondary Drinking Water Quality Standards per Chapter 62-550 <br /> F .A . C . , and additional parameters are also included in the unit <br /> price specified herein . <br /> Measurement and Payment <br /> 01026-5 <br /> 04-IRC Measurel 10117/07 <br />