Laserfiche WebLink
1 . 3 . 18 Item No . A- 18 : Wellhead Completion - Total Bid <br /> 1 . 3 . 18 . 1 Payment will be made at the Contract lump sum price for the item, <br /> which shall be full compensation for providing wellhead <br /> completion, including all materials, equipment, labor, and all other <br /> incidentals required to complete the work as shown on the <br /> drawings and included in the Specifications . <br /> 1 . 3 . 19 Item No . A- 19 : Demobilization and Site Restoration - Total Bid <br /> 1 . 3 . 19 . 1 Payment will be made at the Contract lump sum price for the item , <br /> which shall be full compensation for removal of all drilling <br /> equipment, debris, material , and personnel from the site, removal <br /> and disposal of unused wellhead piping and materials, and <br /> restoring the site to its original condition. <br /> 1 . 3 . 20 Item No . A-20: Standby Time - Total Bid <br /> 1 . 3 . 20. 1 Payment will be made at the Contract unit price per hour for the <br /> item , which shall be full compensation for shutdown time of the <br /> equipment and drill crew for any portion of the working day as <br /> directed by the OWNER or ENGINEER and detailed in the <br /> specifications . <br /> 1 .3 .21 Item No. A-21 : Well Disinfection , if requested - Total Bid <br /> 1 . 3 . 21 . 1 Payment will be made at the Contract lump sum price for the item , <br /> which shall be full compensation for disinfecting the well <br /> according to applicable section of AWWA standard C654-87, <br /> collection and laboratory analysis of two discharge samples for <br /> total coliform , disposal of disinfected discharge water, and all <br /> materials, equipment, labor, and all incidentals required to <br /> complete the work . <br /> 2.0 PRODUCTS (Not Used) <br /> 3.0 EXECUTION (Not Used) <br /> 4. 0 PAYMENT (Not Used) <br /> END OF SECTION <br /> Measurement and Payment <br /> 01026-6 <br /> 04-IRC Measurel 10/17/07 <br />