My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02010 <br /> MOBILIZATION AND SITE WORK <br /> PARTI - GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . Work included in this section includes all work necessary to transport all materials, <br /> equipment, personnel and prepare site for all well installation and wellhead <br /> construction activities for the four production wells including but not limited to <br /> providing access, power, water and temporary facilities, as needed. <br /> B . The three production wells (N-4, N-5 , and N -6) will be located within the North <br /> (Hobart Park) Water Treatment Plant Wellfield in Indian River County, Florida . <br /> C . Well construction activities include but are not limited to those items described in <br /> Section 01010. <br /> PART 2 - PRODUCTS <br /> 2 .01 GENERAL <br /> A . The CONTRACTOR is solely responsible for proving security for all materials stored <br /> on-site during the remedial activities. <br /> PART 3 - EXECUTION <br /> 3 .01 GENERAL <br /> A . The Contract shall provide 10 days notification to the ENGINEER prior to initiating <br /> mobilization to the site and initiating work. The CONTRACTOR will also provide <br /> proof that all permits have been obtained prior to initiating work . <br /> B . The CONTRACTOR shall restrict his operations to the designated work area and <br /> ensure that construction activities do not disrupt normal operational activities of the <br /> County' s utility services . <br /> C . The CONTRACTOR is responsible for visually inspecting the site to note obstructions <br /> or access difficulties . <br /> D . The CONTRACTOR is responsible for providing access to the work site to facilitate <br /> inspection and testing if required. <br /> PART 4 - PAYMENT <br /> MOBILIZATION AND SITE WORK <br /> 02010- 1 <br /> CI\DOCUME I \mikeh\LOCALS— I \Temp\Temporary Directory 12 for IRC wells Div Lzip\05-FRC_MOB. DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.