Laserfiche WebLink
SECTION 02010 <br /> MOBILIZATION AND SITE WORK <br /> PARTI - GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . Work included in this section includes all work necessary to transport all materials, <br /> equipment, personnel and prepare site for all well installation and wellhead <br /> construction activities for the four production wells including but not limited to <br /> providing access, power, water and temporary facilities, as needed. <br /> B . The three production wells (N-4, N-5 , and N -6) will be located within the North <br /> (Hobart Park) Water Treatment Plant Wellfield in Indian River County, Florida . <br /> C . Well construction activities include but are not limited to those items described in <br /> Section 01010. <br /> PART 2 - PRODUCTS <br /> 2 .01 GENERAL <br /> A . The CONTRACTOR is solely responsible for proving security for all materials stored <br /> on-site during the remedial activities. <br /> PART 3 - EXECUTION <br /> 3 .01 GENERAL <br /> A . The Contract shall provide 10 days notification to the ENGINEER prior to initiating <br /> mobilization to the site and initiating work. The CONTRACTOR will also provide <br /> proof that all permits have been obtained prior to initiating work . <br /> B . The CONTRACTOR shall restrict his operations to the designated work area and <br /> ensure that construction activities do not disrupt normal operational activities of the <br /> County' s utility services . <br /> C . The CONTRACTOR is responsible for visually inspecting the site to note obstructions <br /> or access difficulties . <br /> D . The CONTRACTOR is responsible for providing access to the work site to facilitate <br /> inspection and testing if required. <br /> PART 4 - PAYMENT <br /> MOBILIZATION AND SITE WORK <br /> 02010- 1 <br /> CI\DOCUME I \mikeh\LOCALS— I \Temp\Temporary Directory 12 for IRC wells Div Lzip\05-FRC_MOB. DOC <br />