My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additives may be added to the cement grout, with an average of not more <br /> than 10 percent additives when four percent accelerators are used. In the <br /> cementing of the upper 100 feet of the final casing only, four percent <br /> bentonite may be added. In the lower 100 feet of the final casing, <br /> cementing must be attempted with no additives . Should this prove to be <br /> impractical , a mixture up to 12 percent bentonite maybe used if approved <br /> by the SJRWMD in advance . Use of greater than five percent bentonite <br /> must be pre-approved by the SJRWMD . <br /> 3 . 1 .3 The CONTRACTOR shall utilize a standard mud balance to measure and <br /> verify cement grout density as requested by the ENGINEER. <br /> 3 .2 Additives : <br /> 3 . 2 . 1 The use of special cements or other admixtures (ASTM C494) to reduce <br /> permeability, increase fluidity and/or control set time and the composition <br /> of the resultant cement grout must be pre-approved by the ENGINEER <br /> and the SJRWMD. <br /> 3 . 2 . 2 Consistency and method of mixing shall be reviewed by the ENGINEER <br /> prior to grouting. <br /> 3 .2 . 3 Furnish all bentonite required for cementing in the proportions specified <br /> in the Proposal and as directed by the ENGINEER. <br /> 3 .2 .4 Fumish other cementing additives formulated specifically for well <br /> cementing as required by the ENGINEER. <br /> 3 . 2 . 5 A high shear mixer shall be used for additives and totally hydrated to <br /> smooth slurry before cement is added. For each grout batch, about 5 to <br /> 10 percent of the mixing water shall precede the other components. <br /> 3 .3 Placing : <br /> 3 . 3 . 1 Prior to any cementing, the CONTRACTOR shall use the caliper log to <br /> calculate cement requirements . <br /> 3 . 3 .2 The CONTRACTOR shall submit a cementing plan for approval to the <br /> ENGINEER, 24 hours prior to the first stage of cementing. The <br /> cementing plan shall detail estimated cement quantities for length of <br /> casing to be grouted, the nature of the mix cement slurry including weight <br /> per unit volume (density), proposed cementing schedule, expected <br /> GROUT <br /> 02090 - 3 <br /> C:\DOCUME— I \mikeh\LOCALS- 1\Temp\Temporary Directory 16 for IRC wells Div Imp\OS-IRC_Grout.doc <br /> 10/17/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.