My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pressures, and description of the cementing equipment to be used by the <br /> CONTRACTOR for the cementing operation . <br /> 3 . 3 . 3 All cementing of casing shall be accomplished in the presence of the <br /> ENGINEER. <br /> 3 . 3 .4 If cementing activities require observation by a SJRWMD and/or County <br /> Health Department representative, the CONTRACTOR shall notify and <br /> coordinate cementing activities to accommodate this requirement at no <br /> additional cost to the OWNER. <br /> 3 . 3 . 5 The pressure grout method of cement placement shall be used for the <br /> initial stage of grouting the intermediate and final casings . The grouting <br /> shall be done in such a manner that shall assure the entire filling of the <br /> borehole and annular space from the casing bottom to the vertical stage <br /> height obtained. The grouting shall ensure a watertight seal around the <br /> well casing to avoid downward or upward movement of water along the <br /> casing annulus and borehole. The CONTRACTOR shall monitor <br /> temperature and casing pressure during grouting operations . <br /> 3 .3 . 6 The annular space tremmie method is required for all subsequent cement <br /> stages. The bottom of the tremmie pipe shall initially be set within five <br /> feet of the top of the previous annular grout tag in the well , as approved <br /> by the field ENGINEER. Tremmie pipe shall be withdrawn as the <br /> annulus is filled, and before the cement has begun to set. <br /> 3 . 3 . 7 Samples of each lift of cement grout installed around each of the casings <br /> shall be retained by the CONTRACTOR . These grout samples must be <br /> collected a minimum of three times for each cement batch pumped; <br /> before pumping, in the middle of the batch , and near the end of the batch. <br /> Each sample shall be labeled and forwarded to the ENGINEER. <br /> 3 . 3 . 8 The CONTRACTOR shall submit cement reports to the ENGINEER <br /> identifying the mixture and quantity of cement grout utilized for each <br /> cementing stage completed. <br /> 3 . 3 . 9 Staging and use of thixotropic or other high -yield cement types with <br /> special additives shall be required through highly permeable intervals, if <br /> approved by the ENGINEER and the SJRWMD . <br /> 3 . 3 . 10 Staging and use of gravel in an open borehole area shall be required if <br /> approved by the ENGINEER and the SJRWMD . The gravel shall be <br /> GROUT <br /> 02090 - 4 <br /> C:\DOCUME— I \mikeh\LOCALS-1 \Temp\Temporary Directory 16 for FRC wells Div l .zip\08-IRC_Grou1.doc <br /> 10117/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.