My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02200 <br /> PUMPING TEST <br /> 1 .0 GENERAL <br /> 1 .01 WORK INCLUDED <br /> A . This section covers the work, materials, and equipment necessary for pumping the well <br /> complete . <br /> B . The well will be pumped during development, dynamic geophysical and video logging <br /> of the well . <br /> C . Limited hydraulic testing of the well will also be completed to determine current well <br /> efficiencies. Testing will consist of specific capacity testing or variable rate step <br /> testing. The estimated length of the variable-rate, step-drawdown pumping, or specific <br /> capacity tests at the production well is 8 hours . <br /> D . Three to four different pumping rates shall be utilized during these tests . The <br /> ENGINEER shall determine the rates and time steps in the field. The pump shall be <br /> left undisturbed and in place during the aquifer recovery period, approximately equal <br /> to 50 percent of the total pump test duration. However, the ENGINEER shall be the <br /> sole judge as to length of the tests and therefore may increase or decrease the total <br /> pumping time of the tests. <br /> E . The ENGINEER shall determine the time to begin the variable-rate step-drawdown <br /> test within the time constraints of the Contract period . <br /> 2.0 PRODUCTS <br /> 2 . 01 PERSONNEL <br /> A . The CONTRACTOR shall provide experienced personnel to setup and maintain the <br /> pumping test equipment <br /> B . The CONTRACTOR shall provide experienced personnel that are to collect the water <br /> samples in accordance with applicable Florida Department of Environmental <br /> Protection (FDEP) Standard Operating Procedures (SOPs) per FDEP quality <br /> Assurance Rule, 62- 160 .200 and . 320 Florida Administrative Code (F . A .C) . <br /> C . The CONTRACTOR shall provide the services of an environmental testing laboratory <br /> to analyze the water samples. The laboratory must be certified by the Florida <br /> Department of Health and Rehabilitative Services in accordance with Chapter 64E- 1 , <br /> F .A . C . At the time he submits his bid, the CONTRACTOR must provide (for <br /> PUMPING TEST <br /> 02200- 1 <br /> CADOCUME- 1 \mikeh\LOCALS- 1 \Temp\Temporary Directory 19 for IRC wells Div I .zip\10-TRC_Pumping test.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.