Laserfiche WebLink
SECTION 02200 <br /> PUMPING TEST <br /> 1 .0 GENERAL <br /> 1 .01 WORK INCLUDED <br /> A . This section covers the work, materials, and equipment necessary for pumping the well <br /> complete . <br /> B . The well will be pumped during development, dynamic geophysical and video logging <br /> of the well . <br /> C . Limited hydraulic testing of the well will also be completed to determine current well <br /> efficiencies. Testing will consist of specific capacity testing or variable rate step <br /> testing. The estimated length of the variable-rate, step-drawdown pumping, or specific <br /> capacity tests at the production well is 8 hours . <br /> D . Three to four different pumping rates shall be utilized during these tests . The <br /> ENGINEER shall determine the rates and time steps in the field. The pump shall be <br /> left undisturbed and in place during the aquifer recovery period, approximately equal <br /> to 50 percent of the total pump test duration. However, the ENGINEER shall be the <br /> sole judge as to length of the tests and therefore may increase or decrease the total <br /> pumping time of the tests. <br /> E . The ENGINEER shall determine the time to begin the variable-rate step-drawdown <br /> test within the time constraints of the Contract period . <br /> 2.0 PRODUCTS <br /> 2 . 01 PERSONNEL <br /> A . The CONTRACTOR shall provide experienced personnel to setup and maintain the <br /> pumping test equipment <br /> B . The CONTRACTOR shall provide experienced personnel that are to collect the water <br /> samples in accordance with applicable Florida Department of Environmental <br /> Protection (FDEP) Standard Operating Procedures (SOPs) per FDEP quality <br /> Assurance Rule, 62- 160 .200 and . 320 Florida Administrative Code (F . A .C) . <br /> C . The CONTRACTOR shall provide the services of an environmental testing laboratory <br /> to analyze the water samples. The laboratory must be certified by the Florida <br /> Department of Health and Rehabilitative Services in accordance with Chapter 64E- 1 , <br /> F .A . C . At the time he submits his bid, the CONTRACTOR must provide (for <br /> PUMPING TEST <br /> 02200- 1 <br /> CADOCUME- 1 \mikeh\LOCALS- 1 \Temp\Temporary Directory 19 for IRC wells Div I .zip\10-TRC_Pumping test.DOC <br />